What we need to quote
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Pre-Construction Termite Barriers in Annandale 2038 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Annandale.
Annandale sits about 3.7 km south-west of the CBD in the Inner West, and postcode 2038 is one we are in most weeks. Our technicians are through Annandale most days, so same-day attendance is usually available.
Around Annandale we work the pockets near Jubilee Park station, Badu Park and Norton Plaza most often, so the van is rarely far away when a job comes in.
Under Inner West, Burwood, Strathfield and Canada Bay, we cover Annandale and Forest Lodge, Camperdown and Lilyfield alike. Most of the housing here shares a wall, a roof void or a sub-floor with something else, so we check what adjoins the property rather than treating it in isolation.
Most Annandale bookings come in as terraces and semis where the problem has come through a shared wall. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
The whole of 2038 is on our regular run.
We confirm your slot the day before and arrive at a stated time. Forest Lodge and Camperdown sit on the same run, so earlier appointments in 2038 come up regularly.
The value is detectability. A Annandale house with a barrier and no inspections has half a system.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Annandale build without a compliant, certified system does not get its occupation certificate.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Before the pour, a termite-resistant membrane goes across the prepared ground, protecting the full slab footprint.

Collars sealed to every plumbing pipe, conduit and service that passes through the slab. These are the most common hidden entry points for termites.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Protection for bearers, piers and suspended timber floors on sloping or elevated sites.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
An under-slab system covers ground that nothing applied after construction can get to.
The installation certificate and durable notice have to reach the certifier before the Occupation Certificate is issued.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
Talk to a licensed Sydney technician today - honest advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet, stainless mesh or graded stone creating a layer termites cannot chew through, under the slab or at the perimeter | As durable as the slab itself when left undisturbed, with no top-ups needed | Slab-on-ground homes and non-chemical preferences |
| Penetration collars | A physical collar sealed around every pipe and conduit crossing the slab | Long service life when fitted properly ahead of the pour | All slabs. Usually combined with a perimeter system. |
| Chemical soil barrier | A treated zone created with termiticide in the soil below and around the building | The label and the soil conditions set the service life; it can be re-applied | Builds with tighter budgets, and some complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | Monitoring stations set into the ground, baited to eliminate the colony | Regular servicing of the stations is needed | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Plans and slab details to us, and you get a system recommendation plus a fixed price stage by stage.
Service penetrations collared, and the under-slab membrane or chemical treatment installed once site preparation is done.
The perimeter and cavity barriers are fitted as brickwork or cladding progresses, so there is never a gap at the slab edge.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
The system is recorded on a durable notice fixed in the meter box, and the installation certificate goes to the builder and the certifier.
Maintenance advice and an inspection schedule go to the owner, so the system keeps doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | Confirms in writing the system and products installed, the areas protected and the installer's licence | The builder, the certifier, and the owner's records |
| Product information | The details of whichever physical system or termiticide was used, with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | Maintenance guidance and the AS 3660.2 recommended inspection frequency | Homeowner |
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
We schedule to the plumber's set-out and the concreter's pour, confirming collar installation before the pour inspection once services are in.
Developers and volume builders get consistent pricing, a single point of contact and documentation for every lot or dwelling.
Missing durable notices or unclear installation records are a common reason for occupation certificate delays. We supply everything together so the certifier has what they need.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| System type | Full under-slab physical systems, perimeter-only systems and chemical or reticulation options are priced differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Site complexity | Extra detailing comes with retaining walls, step-downs, sandstone excavation and suspended floors |
| How many attendances | Staged installations follow the build program, and multi-dwelling sites may be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Anywhere in Annandale is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Annandale developments keep colonies alive right under the new slabs.
It is one of the few construction details that still matters commercially fifteen years later.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
Durable notice, installation certificate and product information, all handed over.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Annandale and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Annandale is about 3.7 km south-west of the CBD in the Inner West, and we give you a firm arrival time rather than an all-day window.
Older inner suburbs combine shared structure with ageing drainage, and termites exploit both. Rear courtyards that have been paved over make it worse by trapping damp against the walls.
Joined housing with ageing drainage. That combination decides where product goes far more than the floor plan does.
We do. A lot of our Annandale work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes, applied correctly. Products are registered for this use, placed out of reach rather than across open surfaces, and you will know what to stay off and for how long.
Usually not. Most pre-construction termite barriers work is done with you there, and anything that needs the room vacated is for a short period we will tell you about beforehand.
Allow one to two hours for a typical Annandale property. Larger homes, or ones where the problem has spread, take longer and we will say so when we quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. So if they turn up again within the warranty, ring us and we will attend.
We do. Annandale and Forest Lodge, Camperdown, Lilyfield and Stanmore are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.