What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Cabarita 2137 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Cabarita.
We treat termites right across 2137. Cabarita is roughly 9 km west of the city, which puts it well inside the Inner West run our technicians work. Our technicians are through Cabarita most days, so same-day attendance is usually available.
The Cabarita addresses we attend cluster around Massey Park Golf Course and Kendall Reserve. Parramatta River Regional Park is another part of the suburb we are called to often.
Inner West, Burwood, Strathfield and Canada Bay is the council area for Cabarita, and we treat Breakfast Point, Concord and Mortlake on the same schedule. Most of the housing here shares a wall, a roof void or a sub-floor with something else, so we check what adjoins the property rather than treating it in isolation.
The bulk of our Cabarita work is older semis with a paved rear courtyard and a sub-floor that no longer dries out. Mention the detail when you call 1300 313 373 - it decides how long we need on site.
The whole of 2137 is covered, Cabarita Shopping Centre included.
When you book, we confirm the 2137 run the day before and give you an arrival time rather than a window. If we are already out at Breakfast Point or Concord that morning, we will usually offer you the earlier slot.
Tell whoever does the landscaping on your Cabarita build to keep soil, mulch and paving below the slab edge. It is the single most common way a good system is quietly defeated.
Retro-fitting means drilling and injecting a finished slab, working around landscaping and services. It is slower, more expensive and less complete than doing it at construction on a Cabarita block.
It is not guidance. It is the benchmark a private certifier assesses against, which is why we install to the approved plan rather than to habit.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Before the pour, a termite-resistant membrane goes across the prepared ground, protecting the full slab footprint.

Each pipe, conduit and service crossing the slab is sealed with a collar - penetrations being the most common concealed entry.

A physical barrier at the slab edge and continuing into the wall cavity, preventing concealed tunnelling up the slab's outside face.

A soil-applied APVMA-registered termiticide, with the option of reticulation pipework allowing recharge later without excavation.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Specific detailing where there are retaining walls, sandstone excavation, step-downs or cut-and-fill, as is common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
New Class 1 homes and Class 10 outbuildings need a compliant termite management system where the primary building elements are susceptible.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
An under-slab system covers ground that nothing applied after construction can get to.
The certifier needs the installation certificate and the durable notice in hand to issue the Occupation Certificate.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-proof layer of sheet, stainless mesh or graded stone, installed under the slab or around the perimeter | Designed for the life of the slab if undisturbed; no chemical recharge required | Slab-on-ground construction and owners preferring no chemicals |
| Penetration collars | Collars sealed physically to every pipe and conduit through the slab | Durable when fitted correctly ahead of the pour | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A zone of termiticide-treated soil under and around the structure | Service life follows the product label and soil conditions; re-application is possible | Budget-sensitive builds and certain complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | In-ground monitoring stations that take out the colony | Regular station servicing is required | Existing homes, covered under termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send the plans and slab details - we will specify a system and fix the price for each stage.
All service penetrations are collared, and the under-slab membrane or chemical treatment goes in once the site is prepared.
Perimeter and cavity barriers installed as the walls go up, so no gap is left at the slab edge.
A specified chemical perimeter or reticulation is completed around the finished building, ahead of the paving and the landscaping.
A durable notice fixed in the meter box records the system, and the installation certificate is provided to the builder and the certifier.
The owner is given maintenance guidance and an inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | A written statement of system, products, protected areas and installer licence | Builder, certifier and the owner's records |
| Product information | What physical system or termiticide was used, together with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | How the barrier is kept effective, plus the inspection frequency AS 3660.2 recommends | The homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We fit in around the plumber's set-out and the pour. Tell us once services are in and the collar installation is confirmed before the pour inspection.
Developers and volume builders get consistent pricing, a single point of contact and documentation for every lot or dwelling.
Missing durable notices or unclear installation records are a common reason for occupation certificate delays. We supply everything together so the certifier has what they need.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | The bigger the footprint, the more membrane, perimeter protection and labour required |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| How many attendances | Staged installations follow the build program, and multi-dwelling sites may be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
Anything attached to the structure is part of the structure as far as termites are concerned.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Cabarita site, not on a default.
NSW Pest Management licence 5122967, with installations to AS 3660.1.
We work to your builder's program, so a barrier stage never holds up a pour.
The durable notice, installation certificate and product details are all provided.
Single dwellings, granny flats, duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Cabarita 2137, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. We are about 9 km west of the city here, and Cabarita is covered by the Inner West team.
Most of this area is terrace, semi and converted block, and those share more than people realise - cavities, roof spaces, drainage. termites use all of it.
Joined housing with ageing drainage. That combination decides where product goes far more than the floor plan does.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Cabarita 2137 are all part of what we do, and the paperwork is the kind agents accept.
It is, applied properly. We put product into cracks, voids and stations rather than across open surfaces, and we will tell you what to stay off and for how long before we leave.
Generally no. We will tell you on arrival if any part of the job means keeping out of a room for a while, so there are no surprises.
An hour to two hours covers most jobs. The size of the building and the extent of the problem are what change it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
All of them. Cabarita sits alongside Breakfast Point, Concord, Mortlake and Abbotsford in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Fully insured technicians who turn up when they say they will. Quote within 30 minutes, no obligation.