What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Constitution Hill 2145 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Constitution Hill, and how quickly we can get there.
Our Hills District technicians cover Constitution Hill and the rest of 2145 as a matter of course - it is only about 23.1 km west of the city. We run Constitution Hill on a regular route, and same-day attendance is usually available.
Around Constitution Hill we work the pockets near Otto Losco Reserve, Westmead Shopping Village and Wentworthville station most often, so the van is rarely far away when a job comes in.
Northmead, Westmead and Winston Hills are all on the same route as Constitution Hill. With bushland close by there is constant pressure from outside, so the perimeter and the fence line get as much attention as the house.
Constitution Hill jobs tend to be properties where the fence line matters as much as the kitchen. Let us know which when you ring and we will plan the visit around it.
Richill Park and the remainder of 2145 are on the same run.
The 2145 run is set the day before and you are given an arrival time. Where Northmead and Westmead fall on the same round, we can usually bring the visit forward.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
Retro-fitting means drilling and injecting a finished slab, working around landscaping and services. It is slower, more expensive and less complete than doing it at construction on a Constitution Hill block.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Constitution Hill build without a compliant, certified system does not get its occupation certificate.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical layer across the prepared ground, installed before the pour and covering the whole slab footprint.

Each service penetrating the slab - pipe, conduit, cable - takes a sealed collar. Penetrations are where termites most often get in unseen.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Bearers, piers and suspended timber floors protected on sloping and elevated sites.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Once concrete covers them, pipe penetrations and slab joints cannot be fully protected - it has to happen before the pour.
An under-slab system covers ground that nothing applied after construction can get to.
No Occupation Certificate is issued without the installation certificate and durable notice going to the certifier.
Compliant, documented termite protection is something buyers, building inspectors and lenders all look for.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-resistant layer (sheet, stainless mesh or graded stone particles) that termites can't chew through, laid under the slab or at the perimeter | Designed to last as long as the slab if it isn't disturbed. No chemical top-ups. | Slab-on-ground homes and owners who want a non-chemical option |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | Soil treated with termiticide to form a zone under and around the structure | Service life depends on label and soil, with re-application possible | Budget-conscious projects and certain complex sites |
| Reticulation system | A pipe network laid before paving so termiticide can be pumped back into the soil | Rechargeable for the life of the building without digging up paths | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | In-ground stations used to monitor and eliminate the colony | Stations have to be serviced regularly | Existing homes. See termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Service penetrations collared, and the under-slab membrane or chemical treatment installed once site preparation is done.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
The chemical perimeter or reticulation system, if specified, goes in around the completed building before paving and landscaping.
The system is recorded on a durable notice fixed in the meter box, and the installation certificate goes to the builder and the certifier.
Handover includes maintenance advice and the recommended inspection schedule for keeping the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent record in the meter box: the system, the date installed, the life expectancy of any chemical, the installer, and inspection advice | The certifier, the owner and any future owner |
| Installation certificate | A written record of the system and products installed, which areas are protected, and the installer's licence number | The builder, the certifier and the owner's file |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | What keeps the barrier working, and the inspection frequency recommended by AS 3660.2 | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
For developers and volume builders: consistent pricing, one point of contact, and documentation issued for every lot or dwelling.
A missing durable notice or unclear installation record is a common cause of occupation certificate delay. We supply the lot together so the certifier has everything.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Difficulty of the site | Retaining walls, step-downs, sandstone excavation and suspended floors add to the detailing |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Constitution Hill site, not on a default.
An addition to a protected house is a new entry point unless it is tied into the existing system. We treat it as part of the whole, not a separate job.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
Scheduled around the builder's program, so a barrier stage does not delay the pour.
Durable notice, certificate of installation and product details - all supplied together.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Constitution Hill 2145, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Constitution Hill sits roughly 23.1 km west of the CBD, inside our Hills District run, so we book a time and keep to it.
Where bushland adjoins the block, the question is not how termites got in but how often. The perimeter is what decides that.
Homes with sub-floors, roof voids and bush at the boundary - all three get inspected.
We do all of those. A good share of the Constitution Hill jobs we run are tenanted or strata properties, so the written record comes as standard.
It is, as long as you follow what we tell you on the day - usually keeping off treated surfaces for a couple of hours. Let us know at booking about young children, pets or an aquarium.
Usually not. Most pre-construction termite barriers work is done with you there, and anything that needs the room vacated is for a short period we will tell you about beforehand.
Most pre-construction termite barriers jobs in a Constitution Hill home take between one and two hours on site, depending on the size of the property and how much of it is affected.
You get the AS 3660.1 certificate and the durable notice for the meter box. So if they turn up again within the warranty, ring us and we will attend.
All of them. Constitution Hill sits alongside Northmead, Westmead, Winston Hills and Toongabbie in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.