What we need to quote
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Pre-Construction Termite Barriers in Croydon 2132 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Croydon, and how quickly we can get there.
Croydon sits about 8.9 km west of the CBD in the Inner West, and postcode 2132 is one we are in most weeks. Our technicians are through Croydon most days, so same-day attendance is usually available.
Around Croydon we work the pockets near Reed Reserve, Ashfield Aquatic Centre and Graham Reserve most often, so the van is rarely far away when a job comes in.
The suburb sits in the Inner West, Burwood, Strathfield and Canada Bay area. Burwood, Ashfield and Croydon Park are all covered on the same day, so a problem that has spread across a boundary can be handled in one visit. The building stock is close-packed, so we look at what the property adjoins before deciding where product goes.
Around Croydon the pattern is fairly consistent: apartments and converted blocks where the kitchen backs onto a service riser. Tell us which it is on the phone and we will come prepared for it.
The rest of 2132 is covered too, including the pockets around Westfield Burwood and Croydon station.
The 2132 run is set the day before and you are given an arrival time. Where Burwood and Ashfield fall on the same round, we can usually bring the visit forward.
The exposed slab edge is a designed part of the system: it is where an inspector can see workings before they reach the frame. Most of the failed inspection zones we find on Croydon homes were buried by a landscaper who was never told.
People expect a barrier to be a wall. It is a managed zone: termites either cannot cross it or must build visible workings to do so.
The standard covers the system, the installation and the documentation. All three have to be right - a correctly installed system with missing paperwork still holds up a Croydon handover.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

The whole slab footprint is protected by a termite-resistant membrane laid onto the prepared ground before concrete goes down.

Collars are sealed to every plumbing and electrical penetration through the slab, the most frequent concealed entry route there is.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

APVMA-registered termiticide applied to the soil. Add a reticulation network and the barrier can be topped up later without digging anything up.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
It costs far less now than retrofitting later, and vastly less than repairing termite damage.
New Class 1 homes and Class 10 outbuildings need a compliant termite management system where the primary building elements are susceptible.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
An under-slab system covers ground that nothing applied after construction can get to.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Having the termite protection documented and compliant reassures buyers, inspectors and lenders alike.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A physical layer - membrane, stainless mesh or graded stone - that termites cannot get through, beneath the slab or at its edge | Intended to last the life of the slab if not disturbed, and requires no chemical top-up | Slab-on-ground builds, and owners who want to avoid chemicals |
| Penetration collars | Collars sealed physically around each pipe and conduit passing through the slab | Durable provided they are installed correctly before the pour | Every slab, and normally paired with a perimeter system |
| Chemical soil barrier | Termiticide applied to create a treated soil zone under and around the building | Its life comes down to the product label and the soil, and re-application is available | Budget builds and a number of complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | In-ground monitoring stations that take out the colony | Regular station servicing is required | Existing homes, covered under termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and slab details, and we will recommend a system with a fixed price for each stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
Barriers to the perimeter and cavity go in alongside the brickwork or cladding, eliminating any slab-edge gap.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
The owner is given maintenance guidance and an inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | Fixed permanently in the meter box, recording the system, install date, chemical life expectancy, installer and inspection advice | Certifier, current owner and future owners |
| Installation certificate | Confirms in writing the system and products installed, the areas protected and the installer's licence | The builder, the certifier, and the owner's records |
| Product information | Details of the physical system or termiticide used, including safety data sheets for chemicals | Builder and owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
Developers and volume builders work to consistent pricing with a single contact and documentation for every dwelling.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| Which system | A full under-slab physical system, a perimeter-only system, and chemical or reticulation options all price differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab requires a collar |
| How complex the site is | Retaining walls, step-downs, sandstone excavation and suspended floors all add detailing |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
It is one of the few construction details that still matters commercially fifteen years later.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
An addition to a protected house is a new entry point unless it is tied into the existing system. We treat it as part of the whole, not a separate job.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
You get the durable notice, the installation certificate and the product details.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Croydon and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Croydon sits roughly 8.9 km west of the CBD, inside our Inner West run, so we book a time and keep to it.
Joined housing is the reason. Where walls, roof voids and sub-floors are continuous between properties, termites are a street-level problem rather than a house-level one.
Terraces, semis and converted blocks, which share structure - so we check what adjoins the property rather than treating it as a standalone building.
We do all of those. A good share of the Croydon jobs we run are tenanted or strata properties, so the written record comes as standard.
It is, provided the instructions are followed. We will tell you what to keep clear of and for how long before we leave. Let us know about children, pets or fish tanks when you book.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
Between one and two hours covers the majority of jobs. We do not book so tightly that a technician has to cut a job short.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit inside that period does not cost you anything.
Yes. As well as Croydon we cover Burwood, Ashfield, Croydon Park and Canada Bay on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.