What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Curl Curl 2096 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Curl Curl sits, who covers it and what it costs.
Curl Curl sits about 13.1 km north-east of the CBD in the Northern Beaches, and postcode 2096 is one we are in most weeks. We run Curl Curl on a regular route, and same-day attendance is usually available.
The Curl Curl addresses we attend cluster around Dee Why Grand Shopping Centre and Cooksey Reserve. Harbord Bowling and Recreation Club is another part of the suburb we are called to often.
Northern Beaches is the council area for Curl Curl, and we treat Freshwater, North Curl Curl and Queenscliff on the same schedule. Being this close to the coast, sub-floors and ground-floor bathrooms stay damp most of the year, which is the condition that keeps activity going.
Most Curl Curl bookings come in as unit blocks a street or two back from the water, plus the odd beachfront cafe. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We cover the remainder of 2096 as well, from Pavilion Reserve through to Curl Curl Beach.
The 2096 run is set the day before and you are given an arrival time. Where Freshwater and North Curl Curl fall on the same round, we can usually bring the visit forward.
Most Curl Curl builds are waffle pod or raft, and the two are detailed differently at the edge. Tell us which it is when you send the plans and the quote will be right first time.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Laid on the prepared ground before the pour, this termite-resistant membrane protects the complete footprint of the slab.

A collar is sealed around each plumbing pipe, conduit and service passing through the slab, because those are the most common hidden entry points.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

Termiticide registered with the APVMA goes into the soil, and a reticulation pipe network can be added so later recharging needs no digging.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Retaining walls, sandstone excavation, step-downs and cut-and-fill - all common in Sydney, all needing their own detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Doing it now is far cheaper than retrofitting a system later, and cheaper again than repairing termite damage.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
An under-slab system covers ground that nothing applied after construction can get to.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Termite-resistant sheet, stainless mesh or graded stone laid under the slab or at the perimeter, impassable to termites | Lasts as long as the slab when undisturbed, with no chemical recharging | Slab-on-ground homes, and owners choosing a non-chemical option |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Treated soil - termiticide applied beneath and around the building | Longevity depends on label and soil conditions, and it can be renewed | Cost-conscious builds, and some complex sites |
| Reticulation system | A pipe network installed ahead of paving, allowing the soil to be re-treated by pumping | Can be topped up throughout the building's life without digging up paving | Homes surrounded by paving or heavy landscaping |
| Baiting (post-construction) | In-ground stations that monitor and then eliminate the colony | Stations need servicing on a regular schedule | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
A specified chemical perimeter or reticulation is completed around the finished building, ahead of the paving and the landscaping.
The meter box carries a durable notice recording the system, and the builder and certifier each receive the installation certificate.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice in the meter box recording the system, installation date, the life expectancy of any chemical used, the installer and inspection advice | The certifier, the owner and future owners |
| Installation certificate | A written record of the system and products installed, which areas are protected, and the installer's licence number | The builder, the certifier and the owner's file |
| Product information | Specifications for the physical system or termiticide used, plus safety data sheets where chemicals are involved | Builder and owner |
| Maintenance & inspection advice | How the barrier is kept effective, plus the inspection frequency AS 3660.2 recommends | The homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
Consistent pricing, one point of contact and per-lot documentation for developers and volume builders.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| System type | There is a real price difference between under-slab physical, perimeter-only, chemical and reticulation systems |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Site complexity | Extra detailing comes with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Curl Curl builds the alfresco slab poured separately is the one most often left out.
Our barrier work takes in Curl Curl and across toward Freshwater, on single builds and multi-lot developments alike.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
We work to your builder's program, so a barrier stage never holds up a pour.
Durable notice, installation certificate and product information, all handed over.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. There is no call-out charge in Curl Curl 2096. The final number comes down to the property itself, and it is fixed before we begin. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Northern Beaches technicians cover Curl Curl daily, and you get a confirmed arrival time when you book.
Humidity close to the coast does not fall away in winter the way it does inland, so termites here get a longer active season than they would further west.
Coastal housing here is a mix, but the damp lower level is consistent across most of it.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across Curl Curl 2096, and we provide the written report agents and strata managers ask for.
Yes, applied correctly. Products are registered for this use, placed out of reach rather than across open surfaces, and you will know what to stay off and for how long.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
Most pre-construction termite barriers jobs in a Curl Curl home take between one and two hours on site, depending on the size of the property and how much of it is affected.
You get the AS 3660.1 certificate and the durable notice for the meter box. If activity continues past the expected period, call us and we will come back.
All of them. Curl Curl sits alongside Freshwater, North Curl Curl, Queenscliff and Brookvale in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Fully insured technicians who turn up when they say they will. Quote within 30 minutes, no obligation.