What we need to quote
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Killara 2071 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Killara sits, who covers it and what it costs.
Killara sits about 11.9 km north of the CBD in the Upper North Shore, and postcode 2071 is one we are in most weeks. We run Killara on a regular route, and same-day attendance is usually available.
Our Killara work takes in the streets by Selkirk Park and Sir Phillip Game Reserve, through to Lindfield Shopping Village at the other end.
This is the Ku-ring-gai and Hornsby area, and our runs here also take in Lindfield, Gordon and East Killara. Backing onto bush means re-entry is the issue, so proofing and the perimeter do the real work here.
The bulk of our Killara work is houses backing onto a reserve, where the pressure is constant from outside. Mention the detail when you call 1300 313 373 - it decides how long we need on site.
Our Killara runs also take in Gordon Golf Club and the area near Lindfield station, so the whole postcode is served.
Bookings for 2071 are confirmed the day before with a set arrival time, not an all-day window. Jobs at Lindfield and Gordon often share the same run, which is how earlier slots come up.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
It is not guidance. It is the benchmark a private certifier assesses against, which is why we install to the approved plan rather than to habit.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

APVMA-registered termiticide into the soil, with optional reticulation pipework for recharging the barrier later without excavation.

Protection for the piers, bearers and suspended timber flooring on elevated or sloping sites.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Installing at construction costs a fraction of retrofitting a system, let alone repairing termite damage later.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
An under-slab system covers ground that nothing applied after construction can get to.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Buyers, inspectors and lenders all respond to documented, compliant termite protection.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A treated zone of termiticide in the soil under and around the building | Service life depends on the product label and soil conditions. It can be re-applied. | Budget-conscious builds and some complex sites |
| Reticulation system | Pipework laid before the paving so termiticide can be pumped back into the soil later | Rechargeable for the life of the building, with no need to lift paths | Houses ringed by paving or landscaping |
| Baiting (post-construction) | In-ground stations that monitor and then eliminate the colony | The stations require servicing on a regular schedule | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
With your plans and slab details we recommend a system and price every stage, fixed.
Every service gets its collar, then the under-slab membrane or chemical treatment is installed on the prepared site.
Barriers to the perimeter and cavity go in alongside the brickwork or cladding, eliminating any slab-edge gap.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
The meter box carries a durable notice recording the system, and the builder and certifier each receive the installation certificate.
The owner receives advice on maintenance plus a recommended inspection schedule to maintain the system.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice in the meter box recording the system, installation date, the life expectancy of any chemical used, the installer and inspection advice | The certifier, the owner and future owners |
| Installation certificate | Written confirmation of what system and products went in, the areas protected, and the installer's licence | Builder and certifier, plus the owner's records |
| Product information | What physical system or termiticide was used, together with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
We schedule around the plumber's set-out and the concreter's pour. Tell us when services are in and we will confirm the collar installation before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Size of slab and perimeter | Larger footprints take more membrane, more perimeter protection and more labour |
| Which system | A full under-slab physical system, a perimeter-only system, and chemical or reticulation options all price differently |
| Number of penetrations | A collar is needed for each plumbing and electrical penetration through the slab |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| How many visits | Installations are staged to the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
A documented, serviced termite management system is something a Killara buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
Our barrier work takes in Killara and across toward Lindfield, on single builds and multi-lot developments alike.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Killara builds the alfresco slab poured separately is the one most often left out.
We hold NSW Pest Management licence 5122967 and install to AS 3660.1.
Scheduled around the builder's program, so a barrier stage does not delay the pour.
The durable notice, installation certificate and product details are all provided.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Killara. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 11.9 km north of the city, Killara is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Backing onto bush means constant pressure from outside. termites are already established in the reserve, and the house is simply the next thing they reach.
Detached houses on larger blocks with bush on a boundary, so the fence line and perimeter matter as much as the interior.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across Killara 2071, and we provide the written report agents and strata managers ask for.
Yes, when it is applied properly. We use registered products at label rates and tell you which areas to keep clear and for how long. Mention pets, fish tanks or allergies when you book.
You do not normally need to leave. Anything requiring an empty room is short, and you will know about it before the work starts.
Usually between one and two hours on site. Bigger properties and heavier infestations take more, and that is included in the quote rather than added afterwards.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit inside that period does not cost you anything.
We cover the whole of Killara, from the streets around Sir Phillip Game Reserve out to the suburb boundary and on into Lindfield.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast, friendly, fully insured technicians. No-obligation quote within 30 minutes.