What we need to quote
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Pre-Construction Termite Barriers in Lilli Pilli 2229 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Lilli Pilli, and how quickly we can get there.
Postcode 2229 covers Lilli Pilli and the streets immediately around it. At about 23.8 km south of the CBD it falls in the Sutherland Shire, where we have vans out daily. We run Lilli Pilli on a regular route, and same-day attendance is usually available.
If you are near Turriell Bay Road Reserve, Boomerang Avenue Reserve or Maian Bar Beach, that is ground we cover constantly - it is the busiest part of Lilli Pilli for us.
Sutherland Shire is the council area for Lilli Pilli, and we treat Port Hacking, Dolans Bay and Maianbar on the same schedule. Bush edges keep re-supplying the problem, which is why we treat the boundary rather than only the interior.
What we see in Lilli Pilli is houses backing onto a reserve, where the pressure is constant from outside. Describing it accurately when you book saves a second visit.
The whole of 2229 is on our regular run.
Your appointment is confirmed the day before with a real arrival time. Because Port Hacking and Dolans Bay are covered on the same round, 2229 often has an earlier slot available.
We photograph each penetration as it is treated, so there is a record of what was done rather than an assurance.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
The value is detectability. A Lilli Pilli house with a barrier and no inspections has half a system.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Laid on the prepared ground before the pour, this termite-resistant membrane protects the complete footprint of the slab.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier at the slab edge and continuing into the wall cavity, preventing concealed tunnelling up the slab's outside face.

APVMA-registered termiticide applied to the soil, with the option of a reticulation pipe network so the barrier can be recharged later without digging.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
The only time pipe penetrations and slab joints can be properly protected is before the concrete covers them.
An under-slab system protects the parts of the footprint no later treatment can access.
The certifier needs the installation certificate and the durable notice in hand to issue the Occupation Certificate.
Having the termite protection documented and compliant reassures buyers, inspectors and lenders alike.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Termite-resistant sheet, stainless mesh or graded stone laid under the slab or at the perimeter, impassable to termites | Lasts as long as the slab when undisturbed, with no chemical recharging | Slab-on-ground homes, and owners choosing a non-chemical option |
| Penetration collars | Physical collars sealed to each pipe and conduit through the slab | They last if the installation before the pour was done correctly | Every slab, generally alongside a perimeter system |
| Chemical soil barrier | Termiticide applied to create a treated soil zone under and around the building | Its life comes down to the product label and the soil, and re-application is available | Budget builds and a number of complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | In-ground monitoring stations that eliminate the colony | Stations need regular servicing | Existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send the plans and slab details - we will specify a system and fix the price for each stage.
Collars are fitted to all service penetrations, and the under-slab membrane or chemical treatment follows on the prepared site.
Barriers to the perimeter and cavity go in alongside the brickwork or cladding, eliminating any slab-edge gap.
The chemical perimeter or reticulation system, if specified, goes in around the completed building before paving and landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | The details of whichever physical system or termiticide was used, with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
For developers and volume builders: consistent pricing, one point of contact, and documentation issued for every lot or dwelling.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Size of slab and perimeter | Larger footprints take more membrane, more perimeter protection and more labour |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of visits | The staged install follows your build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Lilli Pilli builds the alfresco slab poured separately is the one most often left out.
A documented, serviced termite management system is something a Lilli Pilli buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
Licence 5122967 in NSW, and installations completed to AS 3660.1.
We fit the builder's program, so no barrier stage ever delays a pour.
We supply the durable notice, the installation certificate and the product details.
One house, a granny flat, a duplex, or a full multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Lilli Pilli. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 23.8 km south of the city, Lilli Pilli is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Backing onto bush means constant pressure from outside. termites are already established in the reserve, and the house is simply the next thing they reach.
Houses on larger, often sloping blocks with bush on at least one boundary, so the perimeter and the fence line are central to the job.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Lilli Pilli 2229 are all covered, with documentation suitable for an agent or a strata manager.
Yes, with the usual care. Everything is APVMA-registered and used to label, and we will work around pets, aquariums and anyone in the house with a respiratory condition if you tell us when you book.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
For a standard Lilli Pilli home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Call us if activity picks up again and we will arrange the return visit.
Yes - we work right across the Sutherland Shire area, which takes in Lilli Pilli and the suburbs around it.
Photographs from Elite jobs across Sydney — not stock imagery.
Fully insured technicians who turn up when they say they will. Quote within 30 minutes, no obligation.