What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Little Bay 2036 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Little Bay, and how quickly we can get there.
If you are in Little Bay or anywhere else in 2036, you are in our Eastern Suburbs patch, 12.8 km south of the CBD. We run Little Bay on a regular route, and same-day attendance is usually available.
A lot of our Little Bay jobs are in the streets around Cruwee Cove and Macartney Reserve, and we are out near Chifley Sports Reserve regularly enough that the technician usually knows the access before they arrive.
Under Waverley, Randwick and Woollahra, we cover Little Bay and Phillip Bay, Chifley and La Perouse alike. Being this close to the coast, sub-floors and ground-floor bathrooms stay damp most of the year, which is the condition that keeps activity going.
Around Little Bay the pattern is fairly consistent: ground-floor units with a damp sub-floor, and houses where the garage sits below the living level. Tell us which it is on the phone and we will come prepared for it.
We also work the area near Cape Banks Aquatic Reserve, and the rest of 2036 with it.
We confirm your slot the day before and arrive at a stated time. Phillip Bay and Chifley sit on the same run, so earlier appointments in 2036 come up regularly.
Most Little Bay builds are waffle pod or raft, and the two are detailed differently at the edge. Tell us which it is when you send the plans and the quote will be right first time.
A barrier is a continuous system, so it fails at the join. On Little Bay sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
The standard covers the system, the installation and the documentation. All three have to be right - a correctly installed system with missing paperwork still holds up a Little Bay handover.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

The whole slab footprint is protected by a termite-resistant membrane laid onto the prepared ground before concrete goes down.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

APVMA-registered termiticide applied to the soil, with the option of a reticulation pipe network so the barrier can be recharged later without digging.

Protection for the piers, bearers and suspended timber flooring on elevated or sloping sites.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
Areas no post-construction treatment can ever reach are covered by an under-slab system.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Compliant, documented termite protection is something buyers, building inspectors and lenders all look for.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A physical layer - membrane, stainless mesh or graded stone - that termites cannot get through, beneath the slab or at its edge | Intended to last the life of the slab if not disturbed, and requires no chemical top-up | Slab-on-ground builds, and owners who want to avoid chemicals |
| Penetration collars | A physical collar sealed around every pipe and conduit crossing the slab | Long service life when fitted properly ahead of the pour | All slabs. Usually combined with a perimeter system. |
| Chemical soil barrier | A treated soil zone formed with termiticide under and around the structure | Label and soil conditions govern how long it lasts; re-application is possible | Cost-conscious builds and certain complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | Ground stations for monitoring, then baiting to eliminate the colony | The stations must be serviced regularly | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Give us the plans and slab details; back comes a recommended system and a fixed price for every stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
A specified chemical perimeter or reticulation system is finished around the building prior to paving and landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
At handover the owner is given maintenance advice and the recommended inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | Written confirmation of what system and products went in, the areas protected, and the installer's licence | Builder and certifier, plus the owner's records |
| Product information | Details of the physical system or termiticide used, including safety data sheets for chemicals | Builder and owner |
| Maintenance & inspection advice | What keeps the barrier working, and the inspection frequency recommended by AS 3660.2 | The homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We fit in around the plumber's set-out and the pour. Tell us once services are in and the collar installation is confirmed before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
Occupation certificate delays usually trace to a missing durable notice or poor records. We give the certifier the full set in one go.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area and perimeter | A bigger footprint means more membrane, more perimeter work and more hours |
| System type | Full under-slab physical systems, perimeter-only systems and chemical or reticulation options are priced differently |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
Anything attached to the structure is part of the structure as far as termites are concerned.
A documented, serviced termite management system is something a Little Bay buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
Estates built on cleared farmland inherit the colonies already living in that soil. A new Little Bay house is not a fresh start from a termite point of view - it is a new food source on an established site.
Licensed in NSW under 5122967, with all installations carried out to AS 3660.1.
We attend to suit the builder's program, so the pour is never held up by a barrier stage.
Durable notice, installation certificate and product details, all supplied.
Single dwellings and granny flats through to duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Little Bay 2036, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 12.8 km south of the city, Little Bay is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
The sea air is the factor people miss. It keeps sub-floors and ground-floor bathrooms damp long after summer, which is enough to keep termites going.
Apartments near the beach and houses behind them. Either way the sub-floor and the lower level are the parts that matter.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Little Bay 2036 are all part of what we do, and the paperwork is the kind agents accept.
Yes. Everything we use is registered for the purpose and applied at label rates, and we place product where people and animals do not go. Tell us about pets, aquariums or anyone with a respiratory condition at booking.
In the great majority of jobs, no. If one area needs to be left for an hour or two we say so before we start rather than after.
Usually between one and two hours on site. Bigger properties and heavier infestations take more, and that is included in the quote rather than added afterwards.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit within the warranty period costs you nothing.
Yes. As well as Little Bay we cover Phillip Bay, Chifley, La Perouse and Malabar on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.