What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Lurnea 2170 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Lurnea sits, who covers it and what it costs.
If you are in Lurnea or anywhere else in 2170, you are in our South West Sydney patch, 29.3 km west of the CBD. We cover Lurnea on scheduled runs through the South West Sydney, and we will give you a firm time rather than a window.
If you are near Casula station, Munro Park or Baker Park, that is ground we cover constantly - it is the busiest part of Lurnea for us.
Under Liverpool, Fairfield and Cumberland, we cover Lurnea and Cartwright, Liverpool and Sadleir alike. Estate blocks are compact with narrow side passages, so access and the perimeter are where most of the work happens.
Around Lurnea the pattern is fairly consistent: newer homes on small blocks where next door has the same problem. Tell us which it is on the phone and we will come prepared for it.
Elouera Bushland Reserve and Westfield Liverpool are on the same round, which means every part of 2170 is within our area.
You get a confirmed time, not a window. We plan the 2170 run the day before, and if Cartwright or Liverpool is on the same round there is often an earlier slot going.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
The system does not stop termites existing - it forces them into the open where an inspection will find them. That is why the annual check is part of the system rather than an optional extra.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every pipe, conduit and service through the slab gets a collar sealed to it - these penetrations are the commonest concealed way in.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

Bearers, piers and suspended timber floors protected on sloping and elevated sites.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
The pre-construction price is far below what a retrofit costs, and nowhere near the cost of repairing damage.
New Class 1 homes and Class 10 outbuildings need a compliant termite management system where the primary building elements are susceptible.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
There are areas no later treatment can reach - an under-slab system covers them.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Documented, compliant termite protection reassures buyers, building inspectors and lenders.
Speak to a licensed Sydney technician now. Straight advice, and a fixed quote inside 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet, stainless mesh or graded stone creating a layer termites cannot chew through, under the slab or at the perimeter | As durable as the slab itself when left undisturbed, with no top-ups needed | Slab-on-ground homes and non-chemical preferences |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Termiticide forming a treated zone in the soil beneath and around the building | How long it lasts depends on the label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | A pipe network laid before paving so termiticide can be pumped back into the soil | Rechargeable for the life of the building without digging up paths | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | In-ground monitoring stations that take out the colony | Regular station servicing is required | Existing homes, covered under termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Every service through the slab is collared first, then the under-slab membrane or chemical treatment goes down on the prepared site.
Perimeter and cavity barriers are installed with the brickwork or cladding, closing any gap at the slab edge.
A specified chemical perimeter or reticulation system is finished around the building prior to paving and landscaping.
The system is documented on a durable notice in the meter box, and the installation certificate goes to builder and certifier.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Documentation of the physical system or termiticide applied, including chemical safety data sheets | Builder and owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Our scheduling follows the plumber's set-out and the concreter's pour date. Once services are in, tell us and we confirm collars before the pour inspection.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
A missing durable notice or unclear installation record is a common cause of occupation certificate delay. We supply the lot together so the certifier has everything.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
A documented, serviced termite management system is something a Lurnea buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
Clay soils also hold moisture against the slab, which is the condition termites want. The barrier matters more on those blocks, not less.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
We work around the builder's program so a barrier stage never delays the pour.
You get the durable notice, the installation certificate and the product details.
From a single dwelling or granny flat through to duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in Lurnea 2170. You get the AS 3660.1 certificate and the durable notice for the meter box.
We cover it on scheduled runs, so a day's notice gets you the best slot. Lurnea sits roughly 29.3 km west of the CBD, inside our South West Sydney run, so we book a time and keep to it.
Two things drive it on an estate: compact blocks with narrow side passages, and ground that was cleared and rebuilt recently, which displaces whatever was living in it.
Modern detached homes close together. We treat the perimeter and the boundary because that is the route between properties.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Lurnea 2170 are all covered, with documentation suitable for an agent or a strata manager.
Yes, when it is applied properly. We use registered products at label rates and tell you which areas to keep clear and for how long. Mention pets, fish tanks or allergies when you book.
Usually not. Most pre-construction termite barriers work is done with you there, and anything that needs the room vacated is for a short period we will tell you about beforehand.
For a standard Lurnea home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. So if they turn up again within the warranty, ring us and we will attend.
All of them. Lurnea sits alongside Cartwright, Liverpool, Sadleir and Casula in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.