What we need to quote
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Mount Colah 2079 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Mount Colah, and how quickly we can get there.
Postcode 2079 covers Mount Colah and the streets immediately around it. At about 23.3 km north of the CBD it falls in the Upper North Shore, where we have vans out daily. We run Mount Colah on a regular route, and same-day attendance is usually available.
The Mount Colah addresses we attend cluster around Mount Colah station and Hunt Reserve. Asquith Golf Club is another part of the suburb we are called to often.
Under Ku-ring-gai and Hornsby, we cover Mount Colah and Mount Kuring-gai, Hornsby Heights and Asquith alike. Backing onto bush means re-entry is the issue, so proofing and the perimeter do the real work here.
The bulk of our Mount Colah work is homes on sloping blocks with a sub-floor and bush on the boundary. Mention the detail when you call 1300 313 373 - it decides how long we need on site.
All of 2079 falls inside the area we service.
We confirm your slot the day before and arrive at a stated time. Mount Kuring-gai and Hornsby Heights sit on the same run, so earlier appointments in 2079 come up regularly.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
A pre-construction barrier goes in while the slab is open. Once the concrete is poured and the frame is up, the same protection costs several times as much and never covers the same ground. On a Mount Colah build this is genuinely a now-or-never detail.
Most Mount Colah builds are waffle pod or raft, and the two are detailed differently at the edge. Tell us which it is when you send the plans and the quote will be right first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Laid on the prepared ground before the pour, this termite-resistant membrane protects the complete footprint of the slab.

Every pipe, conduit and service through the slab gets a collar sealed to it - these penetrations are the commonest concealed way in.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
A pre-construction barrier costs far less than a retrofitted system or repairs to termite damage later.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Full protection of pipe penetrations and slab joints is possible only before the concrete is poured over them.
An under-slab system covers ground that nothing applied after construction can get to.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Documented, compliant termite protection reassures buyers, building inspectors and lenders.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-resistant layer (sheet, stainless mesh or graded stone particles) that termites can't chew through, laid under the slab or at the perimeter | Designed to last as long as the slab if it isn't disturbed. No chemical top-ups. | Slab-on-ground homes and owners who want a non-chemical option |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | A treated zone of termiticide in the soil under and around the building | Service life depends on the product label and soil conditions. It can be re-applied. | Budget-conscious builds and some complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | Ground stations for monitoring, then baiting to eliminate the colony | The stations must be serviced regularly | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Give us the plans and slab details; back comes a recommended system and a fixed price for every stage.
Collars are fitted to all service penetrations, and the under-slab membrane or chemical treatment follows on the prepared site.
While the brickwork or cladding goes up, the perimeter and cavity barriers are installed, leaving no gap at the slab edge.
Where specified, a chemical perimeter or reticulation system is completed around the finished building before paving and landscaping.
A durable notice goes into the meter box to record the system, with the installation certificate to the builder and certifier.
Handover includes maintenance advice and the recommended inspection schedule for keeping the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice in the meter box recording the system, installation date, the life expectancy of any chemical used, the installer and inspection advice | The certifier, the owner and future owners |
| Installation certificate | A written statement of system, products, protected areas and installer licence | Builder, certifier and the owner's records |
| Product information | Documentation of the physical system or termiticide applied, including chemical safety data sheets | Builder and owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
We schedule around the plumber's set-out and the concreter's pour. Tell us when services are in and we will confirm the collar installation before the pour inspection.
Developers and volume builders work to consistent pricing with a single contact and documentation for every dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Difficulty of the site | Retaining walls, step-downs, sandstone excavation and suspended floors add to the detailing |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Our barrier work takes in Mount Colah and across toward Mount Kuring-gai, on single builds and multi-lot developments alike.
A documented, serviced termite management system is something a Mount Colah buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
A barrier is a continuous system, so it fails at the join. On Mount Colah sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
We hold NSW Pest Management licence 5122967 and install to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
Durable notice, installation certificate and product details, all supplied.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Mount Colah and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. We are about 23.3 km north of the city here, and Mount Colah is covered by the Upper North Shore team.
Backing onto bush means constant pressure from outside. termites are already established in the reserve, and the house is simply the next thing they reach.
Mostly detached housing backing onto reserve. Proofing and the perimeter are what actually hold here.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Mount Colah 2079 are all part of what we do, and the paperwork is the kind agents accept.
Yes. The products are registered for this use and applied at label rates, and placement keeps them away from where children and animals go. Let us know at booking about pets, fish tanks or anyone with asthma and we will plan the visit around it.
In most cases you can stay. Where an area does need to be left clear it is for a couple of hours at most, and we say so before we start.
Typically one to two hours on site. What extends it is size, access and how far the problem has gone, all of which are accounted for in the quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. So if they turn up again within the warranty, ring us and we will attend.
Yes. As well as Mount Colah we cover Mount Kuring-gai, Hornsby Heights, Asquith and North Wahroonga on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Fully insured technicians who turn up when they say they will. Quote within 30 minutes, no obligation.