What we need to quote
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Port Botany 2036 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Port Botany, and how quickly we can get there.
Port Botany is part of the Eastern Suburbs, 11.9 km or so south of the GPO, and 2036 is a postcode we know well. We run Port Botany on a regular route, and same-day attendance is usually available.
Our Port Botany work takes in the streets by Bonnie Doon Golf Course and Yarra Bay Bicentennial Park, through to Cape Banks Aquatic Reserve at the other end.
The suburb sits in the Waverley, Randwick and Woollahra area. Phillip Bay, La Perouse and Matraville are all covered on the same day, so a problem that has spread across a boundary can be handled in one visit. The coastal damp is the part that matters: sub-floors and ground-floor wet areas rarely dry out properly.
What we see in Port Botany is unit blocks a street or two back from the water, plus the odd beachfront cafe. Describing it accurately when you book saves a second visit.
We cover the remainder of 2036 as well, from Cruwee Cove through to Southpoint Shopping Centre.
The 2036 run is set the day before and you are given an arrival time. Where Phillip Bay and La Perouse fall on the same round, we can usually bring the visit forward.
Everything about a barrier is easier before the pour. That is the whole argument for getting it right the first time.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Port Botany build without a compliant, certified system does not get its occupation certificate.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

Termiticide registered with the APVMA goes into the soil, and a reticulation pipe network can be added so later recharging needs no digging.

Protection for the piers, bearers and suspended timber flooring on elevated or sloping sites.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
There are areas no later treatment can reach - an under-slab system covers them.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A layer of sheet, stainless mesh or graded stone that termites cannot chew through, laid under the slab or at the perimeter | Lasts the life of the slab where it is left undisturbed, with no chemical recharging | Slab-on-ground homes, and owners who would rather not use chemicals |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A treated soil zone formed with termiticide under and around the structure | Label and soil conditions govern how long it lasts; re-application is possible | Cost-conscious builds and certain complex sites |
| Reticulation system | A pipe network installed ahead of paving, allowing the soil to be re-treated by pumping | Can be topped up throughout the building's life without digging up paving | Homes surrounded by paving or heavy landscaping |
| Baiting (post-construction) | In-ground stations that monitor and then eliminate the colony | The stations require servicing on a regular schedule | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
With your plans and slab details we recommend a system and price every stage, fixed.
Penetration collars to all services first, then the under-slab membrane or chemical treatment once the site is ready.
While the brickwork or cladding goes up, the perimeter and cavity barriers are installed, leaving no gap at the slab edge.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
A durable notice in the meter box documents the system; the installation certificate is issued to the builder and certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Documentation of the physical system or termiticide applied, including chemical safety data sheets | Builder and owner |
| Maintenance & inspection advice | Maintenance guidance and the AS 3660.2 recommended inspection frequency | Homeowner |
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area and perimeter | A bigger footprint means more membrane, more perimeter work and more hours |
| System type | There is a real price difference between under-slab physical, perimeter-only, chemical and reticulation systems |
| How many penetrations | Each plumbing and electrical penetration through the slab requires its own collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
We install across 2036 and the surrounding Eastern Suburbs - new builds, knock-down rebuilds, extensions and owner-builder projects around Cape Banks Aquatic Reserve and beyond.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Port Botany developments keep colonies alive right under the new slabs.
Much of western and south-western Sydney sits on reactive clay that moves with moisture. Around Port Botany that movement can open hairline paths underground where nothing is visible from the surface.
Licence 5122967 in NSW, and installations completed to AS 3660.1.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
You get the durable notice, the installation certificate and the product details.
Single homes, granny flats, duplexes and multi-unit developments alike.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Port Botany 2036, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Port Botany is about 11.9 km south of the CBD in the Eastern Suburbs, and we give you a firm arrival time rather than an all-day window.
The air never really dries out near the water, so sub-floors and lower rooms hold moisture through the year. termites need that damp more than they need food, and here they always have it.
A mix of walk-up blocks and free-standing homes, where the lower level and the sub-floor are what we concentrate on.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Port Botany 2036 are all part of what we do, and the paperwork is the kind agents accept.
Yes, when it is applied properly. We use registered products at label rates and tell you which areas to keep clear and for how long. Mention pets, fish tanks or allergies when you book.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
Between one and two hours covers the majority of jobs. We do not book so tightly that a technician has to cut a job short.
You get the AS 3660.1 certificate and the durable notice for the meter box. That is the point of the warranty - you do not pay twice for the same problem.
Yes - we work right across the Waverley, Randwick and Woollahra area, which takes in Port Botany and the suburbs around it.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.