What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Surry Hills 2010 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Surry Hills, and how quickly we can get there.
Surry Hills is part of the Sydney CBD & Inner City, 1.9 km or so south of the GPO, and 2010 is a postcode we know well. Our technicians are through Surry Hills most days, so same-day attendance is usually available.
The Surry Hills addresses we attend cluster around Museum station and Ward Park. Prince Alfred Park is another part of the suburb we are called to often.
Redfern, Haymarket and Chippendale are all on the same route as Surry Hills. Nearly everything here is apartments, so the question is always whether the problem is in your flat or in the building - the risers, the bin room, the wall cavities between lots.
Most Surry Hills bookings come in as units in towers where the kitchen backs onto shared services. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We also work the streets near Central Park Mall and across toward Broadway Shopping Centre - the whole of 2010 is covered.
You get a confirmed time, not a window. We plan the 2010 run the day before, and if Redfern or Haymarket is on the same round there is often an earlier slot going.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
Most Surry Hills builds are waffle pod or raft, and the two are detailed differently at the edge. Tell us which it is when you send the plans and the quote will be right first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical layer across the prepared ground, installed before the pour and covering the whole slab footprint.

Collars sealed to every plumbing pipe, conduit and service that passes through the slab. These are the most common hidden entry points for termites.

The slab edge and the wall cavity take a physical barrier, which denies termites a concealed route up the outside of the slab.

APVMA-registered termiticide applied to the soil. Add a reticulation network and the barrier can be topped up later without digging anything up.

Piers, bearers and suspended timber floors protected, which matters on sloping and elevated blocks.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
Doing it now is far cheaper than retrofitting a system later, and cheaper again than repairing termite damage.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
An under-slab system covers ground that nothing applied after construction can get to.
Before issuing the Occupation Certificate, the certifier requires both the installation certificate and the durable notice.
Having the termite protection documented and compliant reassures buyers, inspectors and lenders alike.
Talk to a licensed Sydney technician today - honest advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet, stainless mesh or graded stone creating a layer termites cannot chew through, under the slab or at the perimeter | As durable as the slab itself when left undisturbed, with no top-ups needed | Slab-on-ground homes and non-chemical preferences |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Termiticide applied to create a treated soil zone under and around the building | Its life comes down to the product label and the soil, and re-application is available | Budget builds and a number of complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | In-ground stations used to monitor and eliminate the colony | Stations have to be serviced regularly | Existing homes. See termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and slab details, and we will recommend a system with a fixed price for each stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or chemical treatment is installed.
Perimeter and cavity barriers installed as the brickwork or cladding goes up, so there is no gap at the slab edge.
A specified chemical perimeter or reticulation system is finished around the building prior to paving and landscaping.
A durable notice goes into the meter box to record the system, with the installation certificate to the builder and certifier.
At handover the owner is given maintenance advice and the recommended inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | A written statement of system, products, protected areas and installer licence | Builder, certifier and the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
We give developers and volume builders consistent pricing, one contact, and documentation lot by lot.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Size of slab and perimeter | Larger footprints take more membrane, more perimeter protection and more labour |
| System chosen | Full under-slab physical, perimeter-only, chemical and reticulation options are each priced differently |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Surry Hills builds the alfresco slab poured separately is the one most often left out.
Anywhere in Surry Hills is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Surry Hills developments keep colonies alive right under the new slabs.
We hold NSW Pest Management licence 5122967 and install to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
We supply the durable notice, the installation certificate and the product details.
Single dwellings, granny flats, duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in Surry Hills 2010. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Surry Hills is about 1.9 km south of the CBD in the Sydney CBD & Inner City, and we give you a firm arrival time rather than an all-day window.
Apartment stock concentrates waste and warmth into shared spaces - chutes, bin rooms, plant rooms - and that is what sustains termites here. The flat you live in is usually not the source.
Mostly apartments, so we treat your lot and, where the source is common property, give you something in writing to take to the building manager.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Surry Hills 2010 are all covered, with documentation suitable for an agent or a strata manager.
It is, applied properly. We put product into cracks, voids and stations rather than across open surfaces, and we will tell you what to stay off and for how long before we leave.
Generally no. We will tell you on arrival if any part of the job means keeping out of a room for a while, so there are no surprises.
Usually between one and two hours on site. Bigger properties and heavier infestations take more, and that is included in the quote rather than added afterwards.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit within the warranty period costs you nothing.
We do. Surry Hills and Redfern, Haymarket, Chippendale and Darlinghurst are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast, friendly, fully insured technicians. No-obligation quote within 30 minutes.