What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Terry Hills 2084 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Terry Hills.
If you are in Terry Hills or anywhere else in 2084, you are in our Northern Beaches patch, 20.7 km north of the CBD. We run Terry Hills on a regular route, and same-day attendance is usually available.
A lot of our Terry Hills jobs are in the streets around JJ Melbourne Hills Memorial Reserve and Shortees Golf, and we are out near Terrigal Reserve regularly enough that the technician usually knows the access before they arrive.
We work under the Northern Beaches area here, and Ingleside, Elanora Heights and Church Point are all on the same route, which matters when termite problems are moving between adjoining properties. Being this close to the coast, sub-floors and ground-floor bathrooms stay damp most of the year, which is the condition that keeps activity going.
What we see in Terry Hills is apartments where the problem is really in the building rather than the flat. Describing it accurately when you book saves a second visit.
The whole of 2084 is on our regular run.
Bookings for 2084 are confirmed the day before with a set arrival time, not an all-day window. Jobs at Ingleside and Elanora Heights often share the same run, which is how earlier slots come up.
People expect a barrier to be a wall. It is a managed zone: termites either cannot cross it or must build visible workings to do so.
The standard covers the system, the installation and the documentation. All three have to be right - a correctly installed system with missing paperwork still holds up a Terry Hills handover.
Retro-fitting means drilling and injecting a finished slab, working around landscaping and services. It is slower, more expensive and less complete than doing it at construction on a Terry Hills block.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A physical, termite-resistant membrane laid over the prepared ground ahead of the pour, covering the slab's entire footprint.

Each pipe, conduit and service crossing the slab is sealed with a collar - penetrations being the most common concealed entry.

A barrier around the slab edge and into the wall cavity prevents termites tunnelling unseen up the slab's outer face.

APVMA-registered termiticide applied to the soil. Add a reticulation network and the barrier can be topped up later without digging anything up.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Doing it now is far cheaper than retrofitting a system later, and cheaper again than repairing termite damage.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Full protection of pipe penetrations and slab joints is possible only before the concrete is poured over them.
An under-slab system protects the parts of the footprint no later treatment can access.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Having the termite protection documented and compliant reassures buyers, inspectors and lenders alike.
Speak to a licensed Sydney technician now. Straight advice, and a fixed quote inside 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A layer of sheet, stainless mesh or graded stone that termites cannot chew through, laid under the slab or at the perimeter | Lasts the life of the slab where it is left undisturbed, with no chemical recharging | Slab-on-ground homes, and owners who would rather not use chemicals |
| Penetration collars | Collars sealed physically to every pipe and conduit through the slab | Durable when fitted correctly ahead of the pour | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A treated zone created with termiticide in the soil below and around the building | The label and the soil conditions set the service life; it can be re-applied | Builds with tighter budgets, and some complex sites |
| Reticulation system | A pre-paving pipe network allowing termiticide to be pumped back into the soil | Rechargeable over the building's life without lifting any paving | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | In-ground monitoring stations that eliminate the colony | Stations need regular servicing | Existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Every service through the slab is collared first, then the under-slab membrane or chemical treatment goes down on the prepared site.
Perimeter and cavity barriers are installed with the brickwork or cladding, closing any gap at the slab edge.
A specified chemical perimeter or reticulation system is finished around the building prior to paving and landscaping.
The system is documented on a durable notice in the meter box, and the installation certificate goes to builder and certifier.
Handover includes maintenance advice and the recommended inspection schedule for keeping the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | Written confirmation covering the system and products used, the protected areas and the installer's licence | Builder, certifier, and the owner's own records |
| Product information | What physical system or termiticide was used, together with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | What keeps the barrier working, and the inspection frequency recommended by AS 3660.2 | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | Larger footprints need more membrane, more perimeter protection and more labour |
| Which system | A full under-slab physical system, a perimeter-only system, and chemical or reticulation options all price differently |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| Number of visits | The staged install follows your build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Terry Hills developments keep colonies alive right under the new slabs.
Anything attached to the structure is part of the structure as far as termites are concerned.
We hold NSW Pest Management licence 5122967 and install to AS 3660.1.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
Everything the certifier wants: durable notice, installation certificate, product details.
From a single dwelling or granny flat through to duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Terry Hills. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Terry Hills sits roughly 20.7 km north of the CBD, inside our Northern Beaches run, so we book a time and keep to it.
The sea air is the factor people miss. It keeps sub-floors and ground-floor bathrooms damp long after summer, which is enough to keep termites going.
A mix of walk-up blocks and free-standing homes, where the lower level and the sub-floor are what we concentrate on.
We do all of those. A good share of the Terry Hills jobs we run are tenanted or strata properties, so the written record comes as standard.
Yes, when it is applied properly. We use registered products at label rates and tell you which areas to keep clear and for how long. Mention pets, fish tanks or allergies when you book.
Usually not. Most of the work is done with you in the house, and where a room does need to be clear it is for a short period we will tell you about on arrival.
An hour to two hours covers most jobs. The size of the building and the extent of the problem are what change it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
Yes. As well as Terry Hills we cover Ingleside, Elanora Heights, Church Point and Oxford Falls on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.