What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Ashbury 2193 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Ashbury, and how quickly we can get there.
Postcode 2193 covers Ashbury and the streets immediately around it. At about 8.9 km south-west of the CBD it falls in the Inner West, where we have vans out daily. Our technicians are through Ashbury most days, so same-day attendance is usually available.
The Ashbury addresses we attend cluster around Ashfield Mall and Canterbury station. James Foster Reserve is another part of the suburb we are called to often.
The suburb sits in the Inner West, Burwood, Strathfield and Canada Bay area. Croydon Park, Ashfield and Canterbury are all covered on the same day, so a problem that has spread across a boundary can be handled in one visit. Terraces, semis and converted blocks share cavities and risers, which is why a single-unit treatment often does not hold on its own.
Most Ashbury bookings come in as terraces and semis where the problem has come through a shared wall. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We also work the area near Graham Reserve, and the rest of 2193 with it.
Bookings for 2193 are confirmed the day before with a set arrival time, not an all-day window. Jobs at Croydon Park and Ashfield often share the same run, which is how earlier slots come up.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on Ashbury builds are the wet-area penetrations - shower wastes and bath traps.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Ashbury build without a compliant, certified system does not get its occupation certificate.
A pre-construction barrier goes in while the slab is open. Once the concrete is poured and the frame is up, the same protection costs several times as much and never covers the same ground. On a Ashbury build this is genuinely a now-or-never detail.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Each service penetrating the slab - pipe, conduit, cable - takes a sealed collar. Penetrations are where termites most often get in unseen.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
Installing at construction costs a fraction of retrofitting a system, let alone repairing termite damage later.
The NCC requires a compliant system on Class 1 dwellings and Class 10 outbuildings where primary building elements are termite-susceptible.
Once concrete covers them, pipe penetrations and slab joints cannot be fully protected - it has to happen before the pour.
An under-slab system protects areas no post-construction treatment can reach.
The certifier needs the installation certificate and the durable notice in hand to issue the Occupation Certificate.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-resistant layer (sheet, stainless mesh or graded stone particles) that termites can't chew through, laid under the slab or at the perimeter | Designed to last as long as the slab if it isn't disturbed. No chemical top-ups. | Slab-on-ground homes and owners who want a non-chemical option |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Termiticide creating a treated zone in the soil beneath and around the building | Service life is set by the product label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | A pre-paving pipe network allowing termiticide to be pumped back into the soil | Rechargeable over the building's life without lifting any paving | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | Monitoring stations set into the ground, baited to eliminate the colony | Regular servicing of the stations is needed | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Give us the plans and slab details; back comes a recommended system and a fixed price for every stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or chemical treatment is installed.
The perimeter and cavity barriers are fitted as brickwork or cladding progresses, so there is never a gap at the slab edge.
Where specified, we complete the chemical perimeter or reticulation around the finished building, before paving and landscaping.
A durable notice goes into the meter box recording the system; builder and certifier each get the installation certificate.
Maintenance advice and an inspection schedule go to the owner, so the system keeps doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent meter box notice listing the system, installation date, life expectancy of any chemical used, the installer and inspection advice | The certifier, the owner and future owners |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Documentation of the physical system or termiticide applied, including chemical safety data sheets | Builder and owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
A missing durable notice or unclear installation record is a common cause of occupation certificate delay. We supply the lot together so the certifier has everything.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | The bigger the footprint, the more membrane, perimeter protection and labour required |
| The system specified | Under-slab physical systems, perimeter-only systems and chemical or reticulation options carry different prices |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors add detailing |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Clay soils also hold moisture against the slab, which is the condition termites want. The barrier matters more on those blocks, not less.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Ashbury builds the alfresco slab poured separately is the one most often left out.
Our barrier work takes in Ashbury and across toward Croydon Park, on single builds and multi-lot developments alike.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
Durable notice, installation certificate and product information, all handed over.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Ashbury. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Inner West technicians cover Ashbury daily, and you get a confirmed arrival time when you book.
These houses were built joined together, and they have aged that way. Party walls, continuous roof voids and shared drainage give termites a route your front door has no bearing on.
Terraces, semis and converted blocks, which share structure - so we check what adjoins the property rather than treating it as a standalone building.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Ashbury 2193 are all covered, with documentation suitable for an agent or a strata manager.
Yes, applied correctly. Products are registered for this use, placed out of reach rather than across open surfaces, and you will know what to stay off and for how long.
Usually not. Most pre-construction termite barriers work is done with you there, and anything that needs the room vacated is for a short period we will tell you about beforehand.
For a standard Ashbury home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Call us if activity picks up again and we will arrange the return visit.
We cover the whole of Ashbury, from the streets around Graham Reserve out to the suburb boundary and on into Croydon Park.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.