What we need to quote
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Canterbury 2193 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Canterbury sits, who covers it and what it costs.
Canterbury is part of the Canterbury-Bankstown, 9.7 km or so south-west of the GPO, and 2193 is a postcode we know well. Our technicians are through Canterbury most days, so same-day attendance is usually available.
The Canterbury addresses we attend cluster around Canterbury station and Lesley Muir Reserve. Warwick Reserve is another part of the suburb we are called to often.
Canterbury-Bankstown is the council area for Canterbury, and we treat Ashbury, Croydon Park and Dulwich Hill on the same schedule. Terraces, semis and converted blocks share cavities and risers, which is why a single-unit treatment often does not hold on its own.
Around Canterbury the pattern is fairly consistent: terraces and semis where the problem has come through a shared wall. Tell us which it is on the phone and we will come prepared for it.
We also work the area near Campsie Shopping Centre, and the rest of 2193 with it.
Your appointment is confirmed the day before with a real arrival time. Because Ashbury and Croydon Park are covered on the same round, 2193 often has an earlier slot available.
A pre-construction barrier goes in while the slab is open. Once the concrete is poured and the frame is up, the same protection costs several times as much and never covers the same ground. On a Canterbury build this is genuinely a now-or-never detail.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
We photograph each penetration as it is treated, so there is a record of what was done rather than an assurance.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A physical, termite-resistant membrane laid over the prepared ground ahead of the pour, covering the slab's entire footprint.

Each service penetrating the slab - pipe, conduit, cable - takes a sealed collar. Penetrations are where termites most often get in unseen.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

APVMA-registered termiticide into the soil, with optional reticulation pipework for recharging the barrier later without excavation.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Specific detailing where there are retaining walls, sandstone excavation, step-downs or cut-and-fill, as is common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
It costs far less now than retrofitting later, and vastly less than repairing termite damage.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
Under-slab protection reaches areas that post-construction treatment simply cannot.
The installation certificate and durable notice have to reach the certifier before the Occupation Certificate is issued.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
Talk to a licensed Sydney technician today - honest advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A physical layer - membrane, stainless mesh or graded stone - that termites cannot get through, beneath the slab or at its edge | Intended to last the life of the slab if not disturbed, and requires no chemical top-up | Slab-on-ground builds, and owners who want to avoid chemicals |
| Penetration collars | Collars sealed physically to every pipe and conduit through the slab | Durable when fitted correctly ahead of the pour | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A treated zone created with termiticide in the soil below and around the building | The label and the soil conditions set the service life; it can be re-applied | Builds with tighter budgets, and some complex sites |
| Reticulation system | A pre-paving pipe network allowing termiticide to be pumped back into the soil | Rechargeable over the building's life without lifting any paving | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | Stations in the ground that monitor activity and eliminate the colony | They need servicing on a regular basis | Existing buildings - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and slab details, and we will recommend a system with a fixed price for each stage.
Every service gets its collar, then the under-slab membrane or chemical treatment is installed on the prepared site.
Barriers to the perimeter and cavity go in alongside the brickwork or cladding, eliminating any slab-edge gap.
Where specified, we complete the chemical perimeter or reticulation around the finished building, before paving and landscaping.
A durable notice fixed in the meter box records the system, and the installation certificate is provided to the builder and the certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | The details of whichever physical system or termiticide was used, with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | Guidance on keeping the barrier effective, with the AS 3660.2 recommended inspection frequency | Homeowner |
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
Developers and volume builders get consistent pricing, a single point of contact and documentation for every lot or dwelling.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area and perimeter | A bigger footprint means more membrane, more perimeter work and more hours |
| System chosen | Full under-slab physical, perimeter-only, chemical and reticulation options are each priced differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab requires a collar |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Canterbury developments keep colonies alive right under the new slabs.
Clay soils also hold moisture against the slab, which is the condition termites want. The barrier matters more on those blocks, not less.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
Scheduled around the builder's program, so a barrier stage does not delay the pour.
We supply the durable notice, the installation certificate and the product details.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. There is no call-out charge in Canterbury 2193. The final number comes down to the property itself, and it is fixed before we begin. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Canterbury-Bankstown technicians cover Canterbury daily, and you get a confirmed arrival time when you book.
Older inner suburbs combine shared structure with ageing drainage, and termites exploit both. Rear courtyards that have been paved over make it worse by trapping damp against the walls.
Older joined housing. The treatment takes account of shared walls, continuous sub-floors and roof voids that run between properties.
We do. A lot of our Canterbury work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes. Everything we use is registered for the purpose and applied at label rates, and we place product where people and animals do not go. Tell us about pets, aquariums or anyone with a respiratory condition at booking.
In the great majority of jobs, no. If one area needs to be left for an hour or two we say so before we start rather than after.
Allow one to two hours for a typical Canterbury property. Larger homes, or ones where the problem has spread, take longer and we will say so when we quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit inside that period does not cost you anything.
Yes - we work right across the Canterbury-Bankstown area, which takes in Canterbury and the suburbs around it.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.