What we need to quote
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Botany 2019 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Botany sits, who covers it and what it costs.
Postcode 2019 covers Botany and the streets immediately around it. At about 8.8 km south of the CBD it falls in the Inner South & City Fringe, where we have vans out daily. Our technicians are through Botany most days, so same-day attendance is usually available.
The Botany jobs we attend tend to sit between Wall Reserve and Eastlake Golf Course.
This is the City of Sydney and Bayside area, and our runs here also take in Banksmeadow, Pagewood and Mascot. Terraces, semis and converted blocks share cavities and risers, which is why a single-unit treatment often does not hold on its own.
Most Botany bookings come in as apartments and converted blocks where the kitchen backs onto a service riser. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
Wherever you are in 2019, you are inside the area our technicians cover.
We confirm your slot the day before and arrive at a stated time. Banksmeadow and Pagewood sit on the same run, so earlier appointments in 2019 come up regularly.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on Botany builds are the wet-area penetrations - shower wastes and bath traps.
The system does not stop termites existing - it forces them into the open where an inspection will find them. That is why the annual check is part of the system rather than an optional extra.
A compliant barrier does not mean termites can never reach the building. It means they cannot reach it concealed - they have to build workings where an inspection will find them. That is why the annual inspection is part of the system, not an upsell.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Laid on the prepared ground before the pour, this termite-resistant membrane protects the complete footprint of the slab.

Collars sealed to every plumbing pipe, conduit and service that passes through the slab. These are the most common hidden entry points for termites.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

APVMA-registered termiticide applied to the soil, with the option of a reticulation pipe network so the barrier can be recharged later without digging.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
Installing at construction costs a fraction of retrofitting a system, let alone repairing termite damage later.
New homes (Class 1) and outbuildings (Class 10) with termite-susceptible primary building elements need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected before concrete covers them.
An under-slab system protects areas no post-construction treatment can reach.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-proof layer of sheet, stainless mesh or graded stone, installed under the slab or around the perimeter | Designed for the life of the slab if undisturbed; no chemical recharge required | Slab-on-ground construction and owners preferring no chemicals |
| Penetration collars | Physical collars sealed around every pipe and conduit through the slab | Long-lasting when installed correctly before the pour | Every slab. Usually combined with a perimeter system. |
| Chemical soil barrier | Termiticide applied to create a treated soil zone under and around the building | Its life comes down to the product label and the soil, and re-application is available | Budget builds and a number of complex sites |
| Reticulation system | Pipes laid in before the paving goes down, so termiticide can be pumped back into the soil | Recharging is possible for the building's life without disturbing paths | Properties ringed by paving or landscaping |
| Baiting (post-construction) | Stations in the ground that monitor activity and eliminate the colony | They need servicing on a regular basis | Existing buildings - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send the plans and slab details - we will specify a system and fix the price for each stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
A specified chemical perimeter or reticulation is completed around the finished building, ahead of the paving and the landscaping.
A durable notice in the meter box documents the system; the installation certificate is issued to the builder and certifier.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Confirms in writing the system and products installed, the areas protected and the installer's licence | The builder, the certifier, and the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
We schedule to the plumber's set-out and the concreter's pour, confirming collar installation before the pour inspection once services are in.
We give developers and volume builders consistent pricing, one contact, and documentation lot by lot.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab requires a collar |
| How complex the site is | Retaining walls, step-downs, sandstone excavation and suspended floors all add detailing |
| How many attendances | Staged installations follow the build program, and multi-dwelling sites may be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Anything attached to the structure is part of the structure as far as termites are concerned.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
A documented, serviced termite management system is something a Botany buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
Scheduled around the builder's program, so a barrier stage does not delay the pour.
Everything the certifier wants: durable notice, installation certificate, product details.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. There is no call-out charge in Botany 2019. The final number comes down to the property itself, and it is fixed before we begin. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Botany is about 8.8 km south of the CBD in the Inner South & City Fringe, and we give you a firm arrival time rather than an all-day window.
Joined housing is the reason. Where walls, roof voids and sub-floors are continuous between properties, termites are a street-level problem rather than a house-level one.
Terraces, semis and converted blocks, which share structure - so we check what adjoins the property rather than treating it as a standalone building.
We do. A lot of our Botany work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes. Everything we use is registered for the purpose and applied at label rates, and we place product where people and animals do not go. Tell us about pets, aquariums or anyone with a respiratory condition at booking.
Normally you can stay. Some treatments mean keeping out of a particular room briefly, and we will flag that when we arrive so you can plan around it.
Allow an hour to two hours for most properties. A bigger building, or one where the problem has spread, takes longer - and we would rather tell you that when quoting than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
We do. Botany and Banksmeadow, Pagewood, Mascot and Eastgardens are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.