What we need to quote
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Clontarf 2093 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Clontarf, and how quickly we can get there.
Postcode 2093 covers Clontarf and the streets immediately around it. At about 7.9 km north-east of the CBD it falls in the Northern Beaches, where we have vans out daily. Our technicians are through Clontarf most days, so same-day attendance is usually available.
If you are near The Village - Balgowlah Stockland, Balgowlah Golf Club or Clontarf Reserve, that is ground we cover constantly - it is the busiest part of Clontarf for us.
The suburb sits in the Northern Beaches area. Balgowlah Heights, Balgowlah and Seaforth are all covered on the same day, so a problem that has spread across a boundary can be handled in one visit. The coastal damp is the part that matters: sub-floors and ground-floor wet areas rarely dry out properly.
The bulk of our Clontarf work is ground-floor units with a damp sub-floor, and houses where the garage sits below the living level. Mention the detail when you call 1300 313 373 - it decides how long we need on site.
Beyond that we are regularly around Harbour View Reserve, and out as far as Clontarf Beach. If you are anywhere in 2093, you are inside the area we run.
Bookings for 2093 are confirmed the day before with a set arrival time, not an all-day window. Jobs at Balgowlah Heights and Balgowlah often share the same run, which is how earlier slots come up.
The exposed slab edge is a designed part of the system: it is where an inspector can see workings before they reach the frame. Most of the failed inspection zones we find on Clontarf homes were buried by a landscaper who was never told.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
A barrier is a continuous system, so it fails at the join. On Clontarf sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A physical, termite-resistant membrane laid over the prepared ground ahead of the pour, covering the slab's entire footprint.

Each service penetrating the slab - pipe, conduit, cable - takes a sealed collar. Penetrations are where termites most often get in unseen.

A barrier around the slab edge and into the wall cavity prevents termites tunnelling unseen up the slab's outer face.

Termiticide registered with the APVMA goes into the soil, and a reticulation pipe network can be added so later recharging needs no digging.

Bearers, piers and suspended timber floors protected on sloping and elevated sites.

Detailing against retaining walls, sandstone excavation, step-downs and cut-and-fill sites common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
It costs far less now than retrofitting later, and vastly less than repairing termite damage.
New homes (Class 1) and outbuildings (Class 10) with termite-susceptible primary building elements need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected before concrete covers them.
An under-slab system covers ground that nothing applied after construction can get to.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
Talk to a licensed Sydney technician today - honest advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Physical collars sealed around every pipe and conduit through the slab | Long-lasting when installed correctly before the pour | Every slab. Usually combined with a perimeter system. |
| Chemical soil barrier | Treated soil - termiticide applied beneath and around the building | Longevity depends on label and soil conditions, and it can be renewed | Cost-conscious builds, and some complex sites |
| Reticulation system | Pipework installed before paving so the soil can be re-treated by pumping | Can be topped up for the life of the building with no excavation of paths | Houses surrounded by paving or landscaped areas |
| Baiting (post-construction) | In-ground stations that monitor and then eliminate the colony | The stations require servicing on a regular schedule | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Give us the plans and slab details; back comes a recommended system and a fixed price for every stage.
Every service through the slab is collared first, then the under-slab membrane or chemical treatment goes down on the prepared site.
Perimeter and cavity barriers installed as the walls go up, so no gap is left at the slab edge.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
The system is recorded on a durable notice in the meter box, and the installation certificate goes to both the builder and the certifier.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Written confirmation of the installed system and products, the areas protected, and the licence of the installer | The builder, the certifier and the owner's records |
| Product information | Details of the physical system or termiticide used, including safety data sheets for chemicals | Builder and owner |
| Maintenance & inspection advice | What keeps the barrier working, and the inspection frequency recommended by AS 3660.2 | The homeowner |
We need the architectural or slab plan, the slab type (raft, waffle pod, suspended), the address, a rough pour date, and engineering details for retaining walls or step-downs.
We schedule to the plumber's set-out and the concreter's pour, confirming collar installation before the pour inspection once services are in.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area and perimeter | A bigger footprint means more membrane, more perimeter work and more hours |
| System type | Full under-slab physical systems, perimeter-only systems and chemical or reticulation options are priced differently |
| Number of penetrations | A collar is needed for each plumbing and electrical penetration through the slab |
| How complex the site is | Retaining walls, step-downs, sandstone excavation and suspended floors all add detailing |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
It is one of the few construction details that still matters commercially fifteen years later.
Clay soils also hold moisture against the slab, which is the condition termites want. The barrier matters more on those blocks, not less.
NSW Pest Management licence 5122967, with installations to AS 3660.1.
Scheduled around the builder's program, so a barrier stage does not delay the pour.
Durable notice, installation certificate and product information, all handed over.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Clontarf. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 7.9 km north-east of the city, Clontarf is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Humidity close to the coast does not fall away in winter the way it does inland, so termites here get a longer active season than they would further west.
Walk-up blocks and free-standing houses, with moisture the common factor. The sub-floor gets as much attention as the kitchen.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across Clontarf 2093, and we provide the written report agents and strata managers ask for.
Yes. The products are registered for this use and applied at label rates, and placement keeps them away from where children and animals go. Let us know at booking about pets, fish tanks or anyone with asthma and we will plan the visit around it.
In the great majority of jobs, no. If one area needs to be left for an hour or two we say so before we start rather than after.
For a standard Clontarf home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. That is the point of the warranty - you do not pay twice for the same problem.
All of them. Clontarf sits alongside Balgowlah Heights, Balgowlah, Seaforth and Fairlight in our coverage, and they are serviced on the same schedule.