What we need to quote
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
Pre-Construction Termite Barriers in Five Dock 2046 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Five Dock sits, who covers it and what it costs.
If you are in Five Dock or anywhere else in 2046, you are in our Inner West patch, 7.4 km west of the CBD. Our technicians are through Five Dock most days, so same-day attendance is usually available.
Around Five Dock we work the pockets near Fred Kelly Reserve, Five Dock Leisure Centre and Massey Park Golf Course most often, so the van is rarely far away when a job comes in.
This is the Inner West, Burwood, Strathfield and Canada Bay area, and our runs here also take in Haberfield, Wareemba and Rodd Point. The building stock is close-packed, so we look at what the property adjoins before deciding where product goes.
The termite calls we take from Five Dock are mostly apartments and converted blocks where the kitchen backs onto a service riser. If yours is one of them, mention it when you ring 1300 313 373 - it changes what the technician brings.
The whole of 2046 is on our regular run.
You get a confirmed time, not a window. We plan the 2046 run the day before, and if Haberfield or Wareemba is on the same round there is often an earlier slot going.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
The exposed slab edge is a designed part of the system: it is where an inspector can see workings before they reach the frame. Most of the failed inspection zones we find on Five Dock homes were buried by a landscaper who was never told.
The system does not stop termites existing - it forces them into the open where an inspection will find them. That is why the annual check is part of the system rather than an optional extra.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical membrane laid across the prepared ground before the pour, protecting the whole footprint of the slab.

Every pipe, conduit and service through the slab gets a collar sealed to it - these penetrations are the commonest concealed way in.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

For sloping or elevated sites, protection covering the piers, bearers and suspended timber floor.

Retaining walls, sandstone excavation, step-downs and cut-and-fill - all common in Sydney, all needing their own detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
New homes (Class 1) and outbuildings (Class 10) with termite-susceptible primary building elements need a compliant termite management system.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
No post-construction treatment reaches under the slab. An under-slab system does.
The installation certificate and durable notice have to reach the certifier before the Occupation Certificate is issued.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A layer termites cannot chew - sheet, stainless mesh or graded stone - laid beneath the slab or at the perimeter | Built to last the life of the slab provided it is not disturbed, with no chemical recharging | Slab-on-ground builds, and owners who would rather avoid chemicals |
| Penetration collars | A physical collar sealed around every pipe and conduit crossing the slab | Long service life when fitted properly ahead of the pour | All slabs. Usually combined with a perimeter system. |
| Chemical soil barrier | Termiticide forming a treated zone in the soil beneath and around the building | How long it lasts depends on the label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | In-ground monitoring stations that take out the colony | Regular station servicing is required | Existing homes, covered under termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and slab details, and we will recommend a system with a fixed price for each stage.
Penetration collars to all services first, then the under-slab membrane or chemical treatment once the site is ready.
Perimeter and cavity barriers go in as the brickwork or cladding rises, so the slab edge is never left with a gap.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
The system is documented on a durable notice in the meter box, and the installation certificate goes to builder and certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Written confirmation of the installed system and products, the areas protected, and the licence of the installer | The builder, the certifier and the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
We schedule around the plumber's set-out and the concreter's pour. Tell us when services are in and we will confirm the collar installation before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
A missing durable notice or unclear installation record is a common cause of occupation certificate delay. We supply the lot together so the certifier has everything.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors all require extra detailing |
| Number of visits | The staged install follows your build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
A barrier is a continuous system, so it fails at the join. On Five Dock sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
Pre-purchase inspections ask about the system and the notice. Having both in order removes a negotiating point from the buyer's side.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Five Dock builds the alfresco slab poured separately is the one most often left out.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
The durable notice, installation certificate and product details are all provided.
Whether it is one dwelling, a granny flat, a duplex or a multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Five Dock and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 7.4 km west of the city, Five Dock is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Joined housing is the reason. Where walls, roof voids and sub-floors are continuous between properties, termites are a street-level problem rather than a house-level one.
Terraces and semis that share walls, roof voids and drainage - so we look at what the property adjoins before deciding where product goes.
We do. A lot of our Five Dock work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes, when it is applied properly. We use registered products at label rates and tell you which areas to keep clear and for how long. Mention pets, fish tanks or allergies when you book.
In most cases you can stay. Where an area does need to be left clear it is for a couple of hours at most, and we say so before we start.
Most pre-construction termite barriers jobs in a Five Dock home take between one and two hours on site, depending on the size of the property and how much of it is affected.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
All of them. Five Dock sits alongside Haberfield, Wareemba, Rodd Point and Canada Bay in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Fully insured technicians who turn up when they say they will. Quote within 30 minutes, no obligation.