What we need to quote
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
Pre-Construction Termite Barriers in Lavender Bay 2060 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Lavender Bay, and how quickly we can get there.
Lavender Bay is part of the Lower North Shore, 2.8 km or so north of the GPO, and 2060 is a postcode we know well. Our technicians are through Lavender Bay most days, so same-day attendance is usually available.
Our Lavender Bay work takes in the streets by Cammeray Golf Course and North Sydney station, through to Sydney Harbour National Park at the other end.
This is the North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill area, and our runs here also take in McMahons Point, North Sydney and Milsons Point. A lot of the housing here is older and close to the water, so sub-floors and lower levels hold damp - and damp is what keeps a population going.
The termite calls we take from Lavender Bay are mostly period houses and converted blocks where the lower level is the problem. If yours is one of them, mention it when you ring 1300 313 373 - it changes what the technician brings.
Our Lavender Bay runs also take in Secret Cove and the area near Greenwood Plaza, so the whole postcode is served.
You get a confirmed time, not a window. We plan the 2060 run the day before, and if McMahons Point or North Sydney is on the same round there is often an earlier slot going.
A barrier is a continuous system, so it fails at the join. On Lavender Bay sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
The value is detectability. A Lavender Bay house with a barrier and no inspections has half a system.
A suspended floor is a different job again - the protection goes to piers, bearers and the subfloor rather than under a slab. On sloping Lavender Bay blocks that is common.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical layer across the prepared ground, installed before the pour and covering the whole slab footprint.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

APVMA-registered termiticide applied to the soil, with the option of a reticulation pipe network so the barrier can be recharged later without digging.

For sloping or elevated sites, protection covering the piers, bearers and suspended timber floor.

Specific detailing where there are retaining walls, sandstone excavation, step-downs or cut-and-fill, as is common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
It costs far less now than retrofitting later, and vastly less than repairing termite damage.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Once concrete covers them, pipe penetrations and slab joints cannot be fully protected - it has to happen before the pour.
No post-construction treatment reaches under the slab. An under-slab system does.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Having the termite protection documented and compliant reassures buyers, inspectors and lenders alike.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Membrane, stainless mesh or graded stone forming a layer termites cannot pass, beneath the slab or around the perimeter | Designed to last as long as the slab itself if undisturbed; no top-ups | Slab-on-ground construction and non-chemical preferences |
| Penetration collars | Each pipe and conduit through the slab is sealed with a physical collar | Long-lasting, assuming correct installation before the pour | Every slab, usually in combination with a perimeter system |
| Chemical soil barrier | Termiticide creating a treated zone in the soil beneath and around the building | Service life is set by the product label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | A pipe network put in ahead of paving, letting termiticide be pumped into the soil later | Rechargeable for as long as the building stands, without digging paths up | Homes enclosed by paving or landscaping |
| Baiting (post-construction) | In-ground monitoring stations that eliminate the colony | Stations need regular servicing | Existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Service penetrations collared, and the under-slab membrane or chemical treatment installed once site preparation is done.
As the walls go up the perimeter and cavity barriers are installed, closing the slab edge as the work progresses.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
A durable notice goes into the meter box recording the system; builder and certifier each get the installation certificate.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | A written statement of system, products, protected areas and installer licence | Builder, certifier and the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
Developers and volume builders work to consistent pricing with a single contact and documentation for every dwelling.
Delays at occupation certificate stage usually come down to a missing durable notice or unclear records. We provide the complete set at once.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | The bigger the footprint, the more membrane, perimeter protection and labour required |
| The system specified | Under-slab physical systems, perimeter-only systems and chemical or reticulation options carry different prices |
| Number of penetrations | Every plumbing and electrical penetration through the slab requires a collar |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors add detailing |
| Visits to site | Staged installation tracks the build program, with multi-dwelling sites often combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Clay soils also hold moisture against the slab, which is the condition termites want. The barrier matters more on those blocks, not less.
A documented, serviced termite management system is something a Lavender Bay buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
Anywhere in Lavender Bay is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
NSW Pest Management licence 5122967, with installations to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
You get the durable notice, the installation certificate and the product details.
Single dwellings and granny flats through to duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Lavender Bay. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 2.8 km north of the city, Lavender Bay is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Old houses, steep blocks and heavy planting. The lower level cut into the slope stays cool and damp, and that is where termites settle well before anyone notices them upstairs.
Period homes with sub-floors and mature gardens. The inspection covers the sub-floor, the perimeter and the planting, not just the interior.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Lavender Bay 2060 are all covered, with documentation suitable for an agent or a strata manager.
It is, provided the instructions are followed. We will tell you what to keep clear of and for how long before we leave. Let us know about children, pets or fish tanks when you book.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
For a standard Lavender Bay home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit inside that period does not cost you anything.
We do. Lavender Bay and McMahons Point, North Sydney, Milsons Point and Waverton are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.