What we need to quote
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
Pre-Construction Termite Barriers in McMahons Point 2060 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where McMahons Point sits, who covers it and what it costs.
McMahons Point sits about 2.7 km north of the CBD in the Lower North Shore, and postcode 2060 is one we are in most weeks. Our technicians are through McMahons Point most days, so same-day attendance is usually available.
The McMahons Point addresses we attend cluster around Mary French Reserve and Quarantine Boat Depot Beach. Greenwood Plaza is another part of the suburb we are called to often.
Under North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill, we cover McMahons Point and Lavender Bay, North Sydney and Milsons Point alike. A lot of the housing here is older and close to the water, so sub-floors and lower levels hold damp - and damp is what keeps a population going.
McMahons Point jobs tend to be older homes near the water with a sub-floor that never fully dries. Let us know which when you ring and we will plan the visit around it.
The rest of 2060 is covered too, including the pockets around Cammeray Golf Course and North Sydney station.
We confirm your slot the day before and arrive at a stated time. Lavender Bay and North Sydney sit on the same run, so earlier appointments in 2060 come up regularly.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on McMahons Point builds are the wet-area penetrations - shower wastes and bath traps.
People expect a barrier to be a guarantee. It is a managed zone: it either stops termites or forces them into the open where they are visible.
A barrier is a continuous system, so it fails at the join. On McMahons Point sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Before the pour, a termite-resistant membrane goes across the prepared ground, protecting the full slab footprint.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

APVMA-registered termiticide into the soil, with optional reticulation pipework for recharging the barrier later without excavation.

Piers, bearers and suspended timber floors protected, which matters on sloping and elevated blocks.

Detailed work against retaining walls, sandstone cuts, step-downs and the cut-and-fill sites common around Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
New homes (Class 1) and outbuildings (Class 10) with termite-susceptible primary building elements need a compliant termite management system.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
An under-slab system covers ground that nothing applied after construction can get to.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Collars sealed physically to every pipe and conduit through the slab | Durable when fitted correctly ahead of the pour | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | Soil treated with termiticide to form a zone under and around the structure | Service life depends on label and soil, with re-application possible | Budget-conscious projects and certain complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | Ground stations for monitoring, then baiting to eliminate the colony | The stations must be serviced regularly | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
With your plans and slab details we recommend a system and price every stage, fixed.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or chemical treatment is installed.
Perimeter and cavity barriers installed as the brickwork or cladding goes up, so there is no gap at the slab edge.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
The meter box carries a durable notice recording the system, and the builder and certifier each receive the installation certificate.
Maintenance advice and a recommended inspection schedule are given to the owner to keep the system working.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Details of the physical system or termiticide used, including safety data sheets for chemicals | Builder and owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
A missing durable notice or unclear installation record is a common cause of occupation certificate delay. We supply the lot together so the certifier has everything.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Size of slab and perimeter | Larger footprints take more membrane, more perimeter protection and more labour |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| How many penetrations | Each plumbing and electrical penetration through the slab requires its own collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Pre-purchase inspections ask about the system and the notice. Having both in order removes a negotiating point from the buyer's side.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
We install across 2060 and the surrounding Lower North Shore - new builds, knock-down rebuilds, extensions and owner-builder projects around Quarantine Boat Depot Beach and beyond.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
Durable notice, installation certificate and product details, all supplied.
From a single dwelling or granny flat through to duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in McMahons Point 2060. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Lower North Shore technicians cover McMahons Point daily, and you get a confirmed arrival time when you book.
Established gardens, original timber and sub-floors that no longer breathe - that is the profile of a harbourside house, and it suits termites very well.
Older houses on sloping blocks, many with a lower level cut into the slope - that level is usually where we start.
We do. A lot of our McMahons Point work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes. The products are registered for this use and applied at label rates, and placement keeps them away from where children and animals go. Let us know at booking about pets, fish tanks or anyone with asthma and we will plan the visit around it.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
Allow one to two hours for a typical McMahons Point property. Larger homes, or ones where the problem has spread, take longer and we will say so when we quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. Call us if activity picks up again and we will arrange the return visit.
Yes. As well as McMahons Point we cover Lavender Bay, North Sydney, Milsons Point and Waverton on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.