What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Lewisham 2049 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Lewisham sits, who covers it and what it costs.
Postcode 2049 covers Lewisham and the streets immediately around it. At about 6.7 km south-west of the CBD it falls in the Inner West, where we have vans out daily. Our technicians are through Lewisham most days, so same-day attendance is usually available.
Our Lewisham work takes in the streets by Lewisham West station and Harvest Park, through to Fanny Durack Aquatic Centre at the other end.
Lewisham is in the Inner West, Burwood, Strathfield and Canada Bay area, and we cover Summer Hill, Petersham and Dulwich Hill on the same runs - handy if you own more than one property or your termite problem has come from next door. Most of the housing here shares a wall, a roof void or a sub-floor with something else, so we check what adjoins the property rather than treating it in isolation.
What we see in Lewisham is apartments and converted blocks where the kitchen backs onto a service riser. Describing it accurately when you book saves a second visit.
We cover the remainder of 2049 as well, from Graham Reserve through to MarketPlace Leichhardt.
You get a confirmed time, not a window. We plan the 2049 run the day before, and if Summer Hill or Petersham is on the same round there is often an earlier slot going.
The system does not stop termites existing - it forces them into the open where an inspection will find them. That is why the annual check is part of the system rather than an optional extra.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Lewisham build without a compliant, certified system does not get its occupation certificate.
Everything about a barrier is easier before the pour. That is the whole argument for getting it right the first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

The whole slab footprint is protected by a termite-resistant membrane laid onto the prepared ground before concrete goes down.

Collars are sealed to every plumbing and electrical penetration through the slab, the most frequent concealed entry route there is.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

A soil-applied APVMA-registered termiticide, with the option of reticulation pipework allowing recharge later without excavation.

Piers, bearers and suspended timber floors protected, which matters on sloping and elevated blocks.

Retaining walls, sandstone cuts, step-downs and cut-and-fill sites are detailed individually - all of them common here.
Once the slab is poured, the areas termites use most are sealed away for good.
The pre-construction price is far below what a retrofit costs, and nowhere near the cost of repairing damage.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
There are areas no later treatment can reach - an under-slab system covers them.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | A treated soil zone formed with termiticide under and around the structure | Label and soil conditions govern how long it lasts; re-application is possible | Cost-conscious builds and certain complex sites |
| Reticulation system | Pipework laid before the paving so termiticide can be pumped back into the soil later | Rechargeable for the life of the building, with no need to lift paths | Houses ringed by paving or landscaping |
| Baiting (post-construction) | Ground stations used for monitoring and then baiting out the colony | Regular servicing of each station is required | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and the slab details and you get back a recommended system with a fixed price against every stage.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
Perimeter and cavity barriers installed as the walls go up, so no gap is left at the slab edge.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
Maintenance advice and an inspection schedule go to the owner, so the system keeps doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent record in the meter box: the system, the date installed, the life expectancy of any chemical, the installer, and inspection advice | The certifier, the owner and any future owner |
| Installation certificate | Written confirmation covering the system and products used, the protected areas and the installer's licence | Builder, certifier, and the owner's own records |
| Product information | Details of the physical system or the termiticide used, with safety data sheets for chemicals | The builder and the owner |
| Maintenance & inspection advice | How the barrier is kept effective, plus the inspection frequency AS 3660.2 recommends | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
We fit in around the plumber's set-out and the pour. Tell us once services are in and the collar installation is confirmed before the pour inspection.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab size and perimeter run | Larger slabs need more membrane and perimeter protection, and more labour |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Site complexity | Extra detailing comes with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of visits | The staged install follows your build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
A barrier is a continuous system, so it fails at the join. On Lewisham sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
Anywhere in Lewisham is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
NSW licence 5122967, and installation work done to AS 3660.1.
We fit the builder's program, so no barrier stage ever delays a pour.
Everything the certifier wants: durable notice, installation certificate, product details.
Single dwellings and granny flats through to duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in Lewisham 2049. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 6.7 km south-west of the city, Lewisham is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Terraces and semis share walls, roof voids and sub-floors, so termites move between houses without ever going outside. That is the single biggest factor here.
Joined older housing, often with a paved rear courtyard holding damp against the wall. Both things shape the treatment.
We do. A lot of our Lewisham work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes, with the usual care. Everything is APVMA-registered and used to label, and we will work around pets, aquariums and anyone in the house with a respiratory condition if you tell us when you book.
In the great majority of jobs, no. If one area needs to be left for an hour or two we say so before we start rather than after.
For a standard Lewisham home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit within the warranty period costs you nothing.
All of them. Lewisham sits alongside Summer Hill, Petersham, Dulwich Hill and Leichhardt in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast, friendly, fully insured technicians. No-obligation quote within 30 minutes.