What we need to quote
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
Pre-Construction Termite Barriers in Neutral Bay 2089 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Neutral Bay sits, who covers it and what it costs.
Neutral Bay is part of the Lower North Shore, 4 km or so north of the GPO, and 2089 is a postcode we know well. Our technicians are through Neutral Bay most days, so same-day attendance is usually available.
Our Neutral Bay work takes in the streets by Sydney Harbour National Park and Hayes Street Beach, through to Greenwood Plaza at the other end.
Under North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill, we cover Neutral Bay and Cremorne Point, Cremorne and Cammeray alike. Period homes near the harbour tend to have sub-floors, original timber and gardens running down to the boundary, so the inspection covers well beyond the kitchen.
The termite calls we take from Neutral Bay are mostly older homes near the water with a sub-floor that never fully dries. If yours is one of them, mention it when you ring 1300 313 373 - it changes what the technician brings.
Beyond that we are regularly around Cammeray Golf Course, and out as far as North Sydney station. If you are anywhere in 2089, you are inside the area we run.
When you book, we confirm the 2089 run the day before and give you an arrival time rather than a window. If we are already out at Cremorne Point or Cremorne that morning, we will usually offer you the earlier slot.
The standard covers the system, the installation and the documentation. All three have to be right - a correctly installed system with missing paperwork still holds up a Neutral Bay handover.
People expect a barrier to be a wall. It is a managed zone: termites either cannot cross it or must build visible workings to do so.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on Neutral Bay builds are the wet-area penetrations - shower wastes and bath traps.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Each service penetrating the slab - pipe, conduit, cable - takes a sealed collar. Penetrations are where termites most often get in unseen.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

For sloping or elevated sites, protection covering the piers, bearers and suspended timber floor.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
Pipe penetrations and slab joints can only be fully protected before concrete covers them.
An under-slab system covers ground that nothing applied after construction can get to.
No Occupation Certificate is issued without the installation certificate and durable notice going to the certifier.
Documented compliance on termite protection reassures the buyer, their inspector and the lender.
Talk to a licensed Sydney technician today - honest advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A layer of sheet, stainless mesh or graded stone that termites cannot chew through, laid under the slab or at the perimeter | Lasts the life of the slab where it is left undisturbed, with no chemical recharging | Slab-on-ground homes, and owners who would rather not use chemicals |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Soil treated with termiticide to form a zone under and around the structure | Service life depends on label and soil, with re-application possible | Budget-conscious projects and certain complex sites |
| Reticulation system | A pipe network installed ahead of paving, allowing the soil to be re-treated by pumping | Can be topped up throughout the building's life without digging up paving | Homes surrounded by paving or heavy landscaping |
| Baiting (post-construction) | Ground stations for monitoring, then baiting to eliminate the colony | The stations must be serviced regularly | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
We work from your plans and slab details, recommending a system and quoting each stage at a fixed price.
Penetration collars fitted to all services, and an under-slab membrane or chemical treatment installed once the site is prepared.
The perimeter and cavity barriers are fitted as brickwork or cladding progresses, so there is never a gap at the slab edge.
Where specified, a chemical perimeter or reticulation system is completed around the finished building before paving and landscaping.
A durable notice goes into the meter box to record the system, with the installation certificate to the builder and certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Confirms in writing the system and products installed, the areas protected and the installer's licence | The builder, the certifier, and the owner's records |
| Product information | What physical system or termiticide was used, together with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | How the barrier is kept effective, plus the inspection frequency AS 3660.2 recommends | The homeowner |
To quote we want the plans or slab plan, the slab type (raft, waffle pod or suspended), the address, an approximate pour date, and engineering for retaining walls or step-downs.
We fit in around the plumber's set-out and the pour. Tell us once services are in and the collar installation is confirmed before the pour inspection.
Consistent pricing across the project, a single point of contact, and documentation for every lot or dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
We install across 2089 and the surrounding Lower North Shore - new builds, knock-down rebuilds, extensions and owner-builder projects around Sydney Harbour National Park and beyond.
Attached garages, pergolas, alfresco slabs and later additions all need to be in the system. On Neutral Bay builds the alfresco slab poured separately is the one most often left out.
Estates built on cleared farmland inherit the colonies already living in that soil. A new Neutral Bay house is not a fresh start from a termite point of view - it is a new food source on an established site.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
The builder's program sets our timing, which means a barrier stage never holds up a pour.
Durable notice, certificate of installation and product details - all supplied together.
Single dwellings and granny flats through to duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in Neutral Bay 2089. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 4 km north of the city, Neutral Bay is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Old houses, steep blocks and heavy planting. The lower level cut into the slope stays cool and damp, and that is where termites settle well before anyone notices them upstairs.
Older houses on sloping blocks, many with a lower level cut into the slope - that level is usually where we start.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Neutral Bay 2089 are all covered, with documentation suitable for an agent or a strata manager.
It is, provided the instructions are followed. We will tell you what to keep clear of and for how long before we leave. Let us know about children, pets or fish tanks when you book.
Generally no. We will tell you on arrival if any part of the job means keeping out of a room for a while, so there are no surprises.
For a standard Neutral Bay home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. If it is not holding, call us - that is exactly what the warranty is for.
Yes - we work right across the North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill area, which takes in Neutral Bay and the suburbs around it.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.