What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Pleasure Point 2172 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Pleasure Point.
Pleasure Point sits about 24 km south-west of the CBD in the Canterbury-Bankstown, and postcode 2172 is one we are in most weeks. We run Pleasure Point on a regular route, and same-day attendance is usually available.
The Pleasure Point addresses we attend cluster around East Hills Park and Voyager Park. Brighton Lakes Golf Club is another part of the suburb we are called to often.
We work under the Canterbury-Bankstown area here, and Voyager Point, East Hills and Hammondville are all on the same route, which matters when termite problems are moving between adjoining properties. Terraces, semis and converted blocks share cavities and risers, which is why a single-unit treatment often does not hold on its own.
The bulk of our Pleasure Point work is older semis with a paved rear courtyard and a sub-floor that no longer dries out. Mention the detail when you call 1300 313 373 - it decides how long we need on site.
We also work the streets near Riverlands Golf Course (closed) and across toward East Hills station - the whole of 2172 is covered.
We confirm your slot the day before and arrive at a stated time. Voyager Point and East Hills sit on the same run, so earlier appointments in 2172 come up regularly.
The value is detectability. A Pleasure Point house with a barrier and no inspections has half a system.
A barrier is a continuous system, so it fails at the join. On Pleasure Point sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

The whole slab footprint is protected by a termite-resistant membrane laid onto the prepared ground before concrete goes down.

Collars are sealed to every plumbing and electrical penetration through the slab, the most frequent concealed entry route there is.

A barrier around the slab edge and into the wall cavity prevents termites tunnelling unseen up the slab's outer face.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Piers, bearers and suspended timber floors protected, which matters on sloping and elevated blocks.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
The pre-construction price is far below what a retrofit costs, and nowhere near the cost of repairing damage.
If a new Class 1 home or Class 10 outbuilding has termite-susceptible primary building elements, a compliant system is required.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
Under-slab protection reaches areas that post-construction treatment simply cannot.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-resistant layer (sheet, stainless mesh or graded stone particles) that termites can't chew through, laid under the slab or at the perimeter | Designed to last as long as the slab if it isn't disturbed. No chemical top-ups. | Slab-on-ground homes and owners who want a non-chemical option |
| Penetration collars | A physical collar sealed around every pipe and conduit crossing the slab | Long service life when fitted properly ahead of the pour | All slabs. Usually combined with a perimeter system. |
| Chemical soil barrier | A treated zone of termiticide in the soil under and around the building | Service life depends on the product label and soil conditions. It can be re-applied. | Budget-conscious builds and some complex sites |
| Reticulation system | A pipe network laid before paving so termiticide can be pumped back into the soil | Rechargeable for the life of the building without digging up paths | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | Ground stations used for monitoring and then baiting out the colony | Regular servicing of each station is required | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
We work from your plans and slab details, recommending a system and quoting each stage at a fixed price.
All service penetrations are collared, and the under-slab membrane or chemical treatment goes in once the site is prepared.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
The system is recorded on a durable notice fixed in the meter box, and the installation certificate goes to the builder and the certifier.
The owner is given maintenance guidance and an inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | A written record of the system and products installed, which areas are protected, and the installer's licence number | The builder, the certifier and the owner's file |
| Product information | The details of whichever physical system or termiticide was used, with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
Volume builders and developers get the same pricing throughout, a single contact, and paperwork for each lot or dwelling.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| System type | Full under-slab physical, perimeter-only, and chemical or reticulation systems are priced differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors add detailing |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
It is one of the few construction details that still matters commercially fifteen years later.
Anywhere in Pleasure Point is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
You get the durable notice, the installation certificate and the product details.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Pleasure Point. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 24 km south-west of the city, Pleasure Point is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Joined housing is the reason. Where walls, roof voids and sub-floors are continuous between properties, termites are a street-level problem rather than a house-level one.
Older joined housing. The treatment takes account of shared walls, continuous sub-floors and roof voids that run between properties.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across Pleasure Point 2172, and we provide the written report agents and strata managers ask for.
It is, applied properly. We put product into cracks, voids and stations rather than across open surfaces, and we will tell you what to stay off and for how long before we leave.
You do not normally need to leave. Anything requiring an empty room is short, and you will know about it before the work starts.
Most pre-construction termite barriers jobs in a Pleasure Point home take between one and two hours on site, depending on the size of the property and how much of it is affected.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
We cover the whole of Pleasure Point, from the streets around East Hills station out to the suburb boundary and on into Voyager Point.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.