What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in South Hurstville 2221 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where South Hurstville sits, who covers it and what it costs.
Our St George & Bayside technicians cover South Hurstville and the rest of 2221 as a matter of course - it is only about 15.8 km south-west of the city. We run South Hurstville on a regular route, and same-day attendance is usually available.
Our South Hurstville work takes in the streets by Young Place Reserve and Westfield Hurstville, through to Beverley Park Golf Club at the other end.
This is the Georges River and Bayside area, and our runs here also take in Connells Point, Hurstville Grove and Blakehurst. The coastal damp is the part that matters: sub-floors and ground-floor wet areas rarely dry out properly.
Most South Hurstville bookings come in as unit blocks a street or two back from the water, plus the odd beachfront cafe. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We also work the streets near Hurstville station and across toward Condor Crescent Reserve - the whole of 2221 is covered.
You get a confirmed time, not a window. We plan the 2221 run the day before, and if Connells Point or Hurstville Grove is on the same round there is often an earlier slot going.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A South Hurstville build without a compliant, certified system does not get its occupation certificate.
People expect a barrier to be a wall. It is a managed zone: termites either cannot cross it or must build visible workings to do so.
Everything about a barrier is easier before the pour. That is the whole argument for getting it right the first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical layer across the prepared ground, installed before the pour and covering the whole slab footprint.

Collars sealed to every plumbing pipe, conduit and service that passes through the slab. These are the most common hidden entry points for termites.

Slab edge and wall cavity are both barriered, blocking the concealed tunnels termites otherwise build up the outside.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

Piers, bearers and suspended timber floors protected, which matters on sloping and elevated blocks.

Retaining walls, sandstone excavation, step-downs and cut-and-fill - all common in Sydney, all needing their own detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Installing at construction costs a fraction of retrofitting a system, let alone repairing termite damage later.
New Class 1 homes and Class 10 outbuildings need a compliant termite management system where the primary building elements are susceptible.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
An under-slab system covers ground that nothing applied after construction can get to.
The certifier needs the installation certificate and the durable notice in hand to issue the Occupation Certificate.
Buyers, inspectors and lenders all respond to documented, compliant termite protection.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | A termite-resistant layer (sheet, stainless mesh or graded stone particles) that termites can't chew through, laid under the slab or at the perimeter | Designed to last as long as the slab if it isn't disturbed. No chemical top-ups. | Slab-on-ground homes and owners who want a non-chemical option |
| Penetration collars | A physical collar sealed around each pipe and conduit passing through the slab | Long service life where the install before the pour was done properly | Every slab, and usually alongside a perimeter system |
| Chemical soil barrier | A treated zone of termiticide in the soil under and around the building | Service life depends on the product label and soil conditions. It can be re-applied. | Budget-conscious builds and some complex sites |
| Reticulation system | A pipe network laid before paving so termiticide can be pumped back into the soil | Rechargeable for the life of the building without digging up paths | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | In-ground stations that monitor and then eliminate the colony | The stations require servicing on a regular schedule | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send the plans and slab details - we will specify a system and fix the price for each stage.
Every service gets its collar, then the under-slab membrane or chemical treatment is installed on the prepared site.
Perimeter and cavity barriers installed as the walls go up, so no gap is left at the slab edge.
Where specified, we complete the chemical perimeter or reticulation around the finished building, before paving and landscaping.
The system is recorded on a durable notice fixed in the meter box, and the installation certificate goes to the builder and the certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | Fixed permanently in the meter box, recording the system, install date, chemical life expectancy, installer and inspection advice | Certifier, current owner and future owners |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Details of the physical system or the termiticide used, with safety data sheets for chemicals | The builder and the owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Timing follows the plumbing set-out and the pour. Tell us when services are complete and we confirm the collars before the pour inspection.
Consistent pricing, one point of contact and per-lot documentation for developers and volume builders.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| System type | Full under-slab physical systems, perimeter-only systems and chemical or reticulation options are priced differently |
| Penetration count | Every plumbing and electrical service through the slab needs a collar fitted |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors add detailing |
| Number of site visits | Staged installations follow the build program. Multi-dwelling sites may be combined. |
Send your plans for a fixed, written quote. There's no charge to quote.
Anything attached to the structure is part of the structure as far as termites are concerned.
Estates built on cleared farmland inherit the colonies already living in that soil. A new South Hurstville house is not a fresh start from a termite point of view - it is a new food source on an established site.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
NSW licence 5122967, and installation work done to AS 3660.1.
We attend to suit the builder's program, so the pour is never held up by a barrier stage.
You get the durable notice, the installation certificate and the product details.
Single dwellings and granny flats through to duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. There is no call-out charge in South Hurstville 2221. The final number comes down to the property itself, and it is fixed before we begin. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. South Hurstville is about 15.8 km south-west of the CBD in the St George & Bayside, and we give you a firm arrival time rather than an all-day window.
The sea air is the factor people miss. It keeps sub-floors and ground-floor bathrooms damp long after summer, which is enough to keep termites going.
Units near the water and houses set back from it, with damp sub-floors the common factor in both.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across South Hurstville 2221, and we provide the written report agents and strata managers ask for.
It is, as long as you follow what we tell you on the day - usually keeping off treated surfaces for a couple of hours. Let us know at booking about young children, pets or an aquarium.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
For a standard South Hurstville home, one to two hours. We would rather tell you it will take longer up front than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Call us if activity picks up again and we will arrange the return visit.
We do. South Hurstville and Connells Point, Hurstville Grove, Blakehurst and Allawah are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.