What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Ultimo 2007 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Ultimo sits, who covers it and what it costs.
Ultimo sits about 1.9 km south-west of the CBD in the Sydney CBD & Inner City, and postcode 2007 is one we are in most weeks. Our technicians are through Ultimo most days, so same-day attendance is usually available.
A lot of our Ultimo jobs are in the streets around Broadway Shopping Centre and Central station, and we are out near Wentworth Park station regularly enough that the technician usually knows the access before they arrive.
Our runs through Ultimo also take in Chippendale, Haymarket and Darlington. Nearly everything here is apartments, so the question is always whether the problem is in your flat or in the building - the risers, the bin room, the wall cavities between lots.
Most Ultimo bookings come in as flats where the neighbouring lot is the actual source. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We also work the streets near Tumbalong Park and across toward Prince Alfred Park - the whole of 2007 is covered.
Your appointment is confirmed the day before with a real arrival time. Because Chippendale and Haymarket are covered on the same round, 2007 often has an earlier slot available.
Retro-fitting means drilling and injecting a finished slab, working around landscaping and services. It is slower, more expensive and less complete than doing it at construction on a Ultimo block.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
Most Ultimo builds are waffle pod or raft, and the two are detailed differently at the edge. Tell us which it is when you send the plans and the quote will be right first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

For sloping or elevated sites, protection covering the piers, bearers and suspended timber floor.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Compared with a retrofit - or with repairing damage - a pre-construction barrier is a small cost.
The NCC requires a compliant system on Class 1 dwellings and Class 10 outbuildings where primary building elements are termite-susceptible.
Before the pour is the only opportunity to fully protect the pipe penetrations and slab joints.
Under-slab protection reaches areas that post-construction treatment simply cannot.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Compliant, documented termite protection is something buyers, building inspectors and lenders all look for.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Membrane, stainless mesh or graded stone forming a layer termites cannot pass, beneath the slab or around the perimeter | Designed to last as long as the slab itself if undisturbed; no top-ups | Slab-on-ground construction and non-chemical preferences |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | Termiticide creating a treated zone in the soil beneath and around the building | Service life is set by the product label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | Pipework installed before paving so the soil can be re-treated by pumping | Can be topped up for the life of the building with no excavation of paths | Houses surrounded by paving or landscaped areas |
| Baiting (post-construction) | In-ground monitoring stations that eliminate the colony | Stations need regular servicing | Existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Plans and slab details to us, and you get a system recommendation plus a fixed price stage by stage.
Every service gets its collar, then the under-slab membrane or chemical treatment is installed on the prepared site.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
A chemical perimeter or reticulation system, where specified, is completed around the building before any paving or landscaping.
A durable notice goes into the meter box to record the system, with the installation certificate to the builder and certifier.
At handover the owner is given maintenance advice and the recommended inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice in the meter box recording the system, installation date, the life expectancy of any chemical used, the installer and inspection advice | The certifier, the owner and future owners |
| Installation certificate | Written confirmation of what system and products went in, the areas protected, and the installer's licence | Builder and certifier, plus the owner's records |
| Product information | Details of the physical system or the termiticide used, with safety data sheets for chemicals | The builder and the owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
We give developers and volume builders consistent pricing, one contact, and documentation lot by lot.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | Larger footprints need more membrane, more perimeter protection and more labour |
| The system specified | Under-slab physical systems, perimeter-only systems and chemical or reticulation options carry different prices |
| Penetration count | Every plumbing and electrical service through the slab needs a collar fitted |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| How many visits | Installations are staged to the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
We install across 2007 and the surrounding Sydney CBD & Inner City - new builds, knock-down rebuilds, extensions and owner-builder projects around Broadway Shopping Centre and beyond.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
Pre-purchase inspections ask about the system and the notice. Having both in order removes a negotiating point from the buyer's side.
NSW Pest Management licence 5122967. Every installation is to AS 3660.1.
We work to your builder's program, so a barrier stage never holds up a pour.
Durable notice, certificate of installation and product details - all supplied together.
Single homes, granny flats, duplexes and multi-unit developments alike.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. There is no call-out charge in Ultimo 2007. The final number comes down to the property itself, and it is fixed before we begin. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Sydney CBD & Inner City technicians cover Ultimo daily, and you get a confirmed arrival time when you book.
Apartment stock concentrates waste and warmth into shared spaces - chutes, bin rooms, plant rooms - and that is what sustains termites here. The flat you live in is usually not the source.
Unit stock, so the method is gels and baits placed into cavities rather than anything sprayed across shared surfaces.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Ultimo 2007 are all part of what we do, and the paperwork is the kind agents accept.
Yes. The products are registered for this use and applied at label rates, and placement keeps them away from where children and animals go. Let us know at booking about pets, fish tanks or anyone with asthma and we will plan the visit around it.
Generally no. We will tell you on arrival if any part of the job means keeping out of a room for a while, so there are no surprises.
Allow one to two hours for a typical Ultimo property. Larger homes, or ones where the problem has spread, take longer and we will say so when we quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. A return visit within the warranty period costs you nothing.
We do. Ultimo and Chippendale, Haymarket, Darlington and Glebe are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.