What we need to quote
Architectural or slab plans, slab type - raft, waffle pod or suspended - site address, approximate pour date, plus engineering details on any retaining walls or step-downs.
Pre-Construction Termite Barriers in Glebe 2037 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Glebe.
Glebe sits about 2.4 km south-west of the CBD in the Sydney CBD & Inner City, and postcode 2037 is one we are in most weeks. Our technicians are through Glebe most days, so same-day attendance is usually available.
The Glebe addresses we attend cluster around St James Park and Broadway Shopping Centre. Broadway Shopping Centre is another part of the suburb we are called to often.
Forest Lodge, Ultimo and Annandale are all on the same route as Glebe. In a tower the population is usually shared. We treat your unit and tell you plainly if the source is common property, because that is what the building has to act on.
Glebe jobs tend to be units in towers where the kitchen backs onto shared services. Let us know which when you ring and we will plan the visit around it.
Beyond that we are regularly around Wentworth Park station, and out as far as Pyrmont Bay station. If you are anywhere in 2037, you are inside the area we run.
We confirm your slot the day before and arrive at a stated time. Forest Lodge and Ultimo sit on the same run, so earlier appointments in 2037 come up regularly.
A compliant barrier does not mean termites can never reach the building. It means they cannot reach it concealed - they have to build workings where an inspection will find them. That is why the annual inspection is part of the system, not an upsell.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on Glebe builds are the wet-area penetrations - shower wastes and bath traps.
Everything about a barrier is easier before the pour. That is the whole argument for getting it right the first time.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Protection for bearers, piers and suspended timber floors on sloping or elevated sites.

Specific detailing where there are retaining walls, sandstone excavation, step-downs or cut-and-fill, as is common across Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
The pre-construction price is far below what a retrofit costs, and nowhere near the cost of repairing damage.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
No post-construction treatment reaches under the slab. An under-slab system does.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Documented, compliant termite protection reassures buyers, building inspectors and lenders.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | A physical collar sealed around every pipe and conduit crossing the slab | Long service life when fitted properly ahead of the pour | All slabs. Usually combined with a perimeter system. |
| Chemical soil barrier | Termiticide applied to create a treated soil zone under and around the building | Its life comes down to the product label and the soil, and re-application is available | Budget builds and a number of complex sites |
| Reticulation system | A pre-paving pipe network allowing termiticide to be pumped back into the soil | Rechargeable over the building's life without lifting any paving | Homes surrounded by paving or landscaping |
| Baiting (post-construction) | Ground stations used for monitoring and then baiting out the colony | Regular servicing of each station is required | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
We work from your plans and slab details, recommending a system and quoting each stage at a fixed price.
Every service through the slab is collared first, then the under-slab membrane or chemical treatment goes down on the prepared site.
Perimeter and cavity barriers are installed with the brickwork or cladding, closing any gap at the slab edge.
Where it is specified, the chemical perimeter or reticulation system is finished around the completed building before any paving or landscaping goes in.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
Maintenance advice and an inspection schedule go to the owner, so the system keeps doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent record in the meter box: the system, the date installed, the life expectancy of any chemical, the installer, and inspection advice | The certifier, the owner and any future owner |
| Installation certificate | Written confirmation of what system and products went in, the areas protected, and the installer's licence | Builder and certifier, plus the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | Advice on maintaining the barrier and the recommended inspection interval under AS 3660.2 | Homeowner |
Architectural or slab plans, slab type - raft, waffle pod or suspended - site address, approximate pour date, plus engineering details on any retaining walls or step-downs.
Scheduling works around the plumber's set-out and the concreter's pour. Let us know when services are in and we confirm collar installation ahead of the pour inspection.
Developers and volume builders work to consistent pricing with a single contact and documentation for every dwelling.
Missing durable notices and unclear installation records hold up occupation certificates regularly. We hand over the full set together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab size and perimeter run | Larger slabs need more membrane and perimeter protection, and more labour |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| Number of penetrations | Every plumbing and electrical penetration through the slab requires a collar |
| Site complexity | Extra detailing comes with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of site visits | Staged installations follow the build program. Multi-dwelling sites may be combined. |
Send your plans for a fixed, written quote. There's no charge to quote.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Glebe site, not on a default.
Clearing removes the trees, not the nests. Stumps and root systems left in the ground around Glebe developments keep colonies alive right under the new slabs.
NSW Pest Management licence 5122967, with installations to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
The durable notice, installation certificate and product details are all provided.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. The fixed price depends on the size of the property and how far the problem has spread, and we confirm it before we start - there is no call-out fee in Glebe 2037. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Our Sydney CBD & Inner City technicians cover Glebe daily, and you get a confirmed arrival time when you book.
Waste is centralised in a tower - chutes, bin rooms, loading areas - and that concentration is what keeps termites fed. Height makes no difference; the risers are a staircase.
High-rise and walk-up blocks, so we scope the building as well as the apartment when the pattern points to common property.
Yes. We work in houses, units, strata blocks, rentals and commercial premises across Glebe 2037, and we provide the written report agents and strata managers ask for.
Yes, with the usual care. Everything is APVMA-registered and used to label, and we will work around pets, aquariums and anyone in the house with a respiratory condition if you tell us when you book.
Most of the time you can carry on as normal. If a particular area needs to be empty we will flag it when we arrive and it is rarely more than a couple of hours.
An hour to two hours covers most jobs. The size of the building and the extent of the problem are what change it.
You get the AS 3660.1 certificate and the durable notice for the meter box. If it is not holding, call us - that is exactly what the warranty is for.
Yes. As well as Glebe we cover Forest Lodge, Ultimo, Annandale and Pyrmont on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.