What we need to quote
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Artarmon 2064 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Where Artarmon sits, who covers it and what it costs.
Our Lower North Shore technicians cover Artarmon and the rest of 2064 as a matter of course - it is only about 7.1 km north of the city. Our technicians are through Artarmon most days, so same-day attendance is usually available.
Around Artarmon we work the pockets near Westfield Chatswood, Lane Cove Country Club and Artarmon station most often, so the van is rarely far away when a job comes in.
We work under the North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill area here, and Willoughby, Chatswood and Lane Cove North are all on the same route, which matters when termite problems are moving between adjoining properties. A lot of the housing here is older and close to the water, so sub-floors and lower levels hold damp - and damp is what keeps a population going.
What we see in Artarmon is waterfront and near-waterfront homes with damp sub-floors and mature gardens. Describing it accurately when you book saves a second visit.
Artarmon Village Green and Blue Gum Reserve are on the same round, which means every part of 2064 is within our area.
Bookings for 2064 are confirmed the day before with a set arrival time, not an all-day window. Jobs at Willoughby and Chatswood often share the same run, which is how earlier slots come up.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

Before the pour, a termite-resistant membrane goes across the prepared ground, protecting the full slab footprint.

Collars are sealed to every plumbing and electrical penetration through the slab, the most frequent concealed entry route there is.

A barrier around the slab edge and into the wall cavity prevents termites tunnelling unseen up the slab's outer face.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Detailed work against retaining walls, sandstone cuts, step-downs and the cut-and-fill sites common around Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
The pre-construction price is far below what a retrofit costs, and nowhere near the cost of repairing damage.
Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements must have a compliant termite management system.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
An under-slab system protects areas no post-construction treatment can reach.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Compliant protection with the paperwork to prove it satisfies buyers, building inspectors and lenders.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Termite-resistant sheet, stainless mesh or graded stone laid under the slab or at the perimeter, impassable to termites | Lasts as long as the slab when undisturbed, with no chemical recharging | Slab-on-ground homes, and owners choosing a non-chemical option |
| Penetration collars | Collars sealed physically to every pipe and conduit through the slab | Durable when fitted correctly ahead of the pour | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A zone of termiticide-treated soil under and around the structure | Service life follows the product label and soil conditions; re-application is possible | Budget-sensitive builds and certain complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | Monitoring stations set into the ground, baited to eliminate the colony | Regular servicing of the stations is needed | For existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send the plans and slab details - we will specify a system and fix the price for each stage.
Collars are fitted to all service penetrations, and the under-slab membrane or chemical treatment follows on the prepared site.
The perimeter and cavity barriers are fitted as brickwork or cladding progresses, so there is never a gap at the slab edge.
A specified chemical perimeter or reticulation is completed around the finished building, ahead of the paving and the landscaping.
The system is documented on a durable notice in the meter box, and the installation certificate goes to builder and certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent record in the meter box: the system, the date installed, the life expectancy of any chemical, the installer, and inspection advice | The certifier, the owner and any future owner |
| Installation certificate | Written confirmation of what system and products went in, the areas protected, and the installer's licence | Builder and certifier, plus the owner's records |
| Product information | Details of the physical system or the termiticide used, with safety data sheets for chemicals | The builder and the owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
We work to the plumber's set-out and the concreter's program. Let us know when the services are in and collars are confirmed before the pour inspection.
For developers and volume builders: consistent pricing, one point of contact, and documentation issued for every lot or dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Footprint and perimeter | More area means more membrane, more perimeter protection and more time on site |
| Type of system | Pricing differs between full under-slab physical systems, perimeter-only systems, and chemical or reticulation options |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Site complexity | Extra detailing comes with retaining walls, step-downs, sandstone excavation and suspended floors |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
Anywhere in Artarmon is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
An addition to a protected house is a new entry point unless it is tied into the existing system. We treat it as part of the whole, not a separate job.
It is one of the few construction details that still matters commercially fifteen years later.
We hold NSW Pest Management licence 5122967 and install to AS 3660.1.
We work around the builder's program so a barrier stage never delays the pour.
We supply the durable notice, the installation certificate and the product details.
From a single dwelling or granny flat through to duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. Two things move it: how big the place is, and how far it has already spread. We work that out on the phone or on site and tell you the figure before anything starts in Artarmon. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Artarmon is about 7.1 km north of the CBD in the Lower North Shore, and we give you a firm arrival time rather than an all-day window.
Sub-floor ventilation on these older homes was designed for an open garden, and most of those gardens are now paved or planted out. The damp that leaves behind is what sustains termites.
Large older homes and converted apartments, with damp lower levels the recurring theme.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Artarmon 2064 are all covered, with documentation suitable for an agent or a strata manager.
Yes. Everything we use is registered for the purpose and applied at label rates, and we place product where people and animals do not go. Tell us about pets, aquariums or anyone with a respiratory condition at booking.
Normally you can stay. Some treatments mean keeping out of a particular room briefly, and we will flag that when we arrive so you can plan around it.
Allow an hour to two hours for most properties. A bigger building, or one where the problem has spread, takes longer - and we would rather tell you that when quoting than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
We do. Artarmon and Willoughby, Chatswood, Lane Cove North and Lane Cove are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.