What we need to quote
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
Pre-Construction Termite Barriers in Lane Cove 2066 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
What we cover in Lane Cove, and how quickly we can get there.
Lane Cove sits about 7.2 km north-west of the CBD in the Lower North Shore, and postcode 2066 is one we are in most weeks. Our technicians are through Lane Cove most days, so same-day attendance is usually available.
If you are near Cameraygal Park, Lane Cove Aquatic Leisure Centre or Batten Reserve, that is ground we cover constantly - it is the busiest part of Lane Cove for us.
North Sydney, Mosman, Willoughby, Lane Cove and Hunters Hill is the council area for Lane Cove, and we treat Lane Cove North, Riverview and Lane Cove West on the same schedule. A lot of the housing here is older and close to the water, so sub-floors and lower levels hold damp - and damp is what keeps a population going.
Lane Cove jobs tend to be waterfront and near-waterfront homes with damp sub-floors and mature gardens. Let us know which when you ring and we will plan the visit around it.
We cover the remainder of 2066 as well, from The Village Shopping Centre through to Lane Cove Country Club.
You get a confirmed time, not a window. We plan the 2066 run the day before, and if Lane Cove North or Riverview is on the same round there is often an earlier slot going.
Every pipe and conduit through the slab is a path. Each one needs its own collar or sealed detail, and the ones most often missed on Lane Cove builds are the wet-area penetrations - shower wastes and bath traps.
Tell whoever does the landscaping on your Lane Cove build to keep soil, mulch and paving below the slab edge. It is the single most common way a good system is quietly defeated.
The value of the system on a Lane Cove home is detectability. Without the inspections that detectability is never used.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every pipe, conduit and service through the slab gets a collar sealed to it - these penetrations are the commonest concealed way in.

A physical barrier runs round the slab edge and into the cavity, so no concealed tunnel can be built up the slab's exterior.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Bearers, piers and suspended timber floors protected on sloping and elevated sites.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Full protection of pipe penetrations and slab joints is possible only before the concrete is poured over them.
An under-slab system covers ground that nothing applied after construction can get to.
Your certifier needs the installation certificate and durable notice before issuing the Occupation Certificate.
Buyers, inspectors and lenders all respond to documented, compliant termite protection.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Membrane, stainless mesh or graded stone forming a layer termites cannot pass, beneath the slab or around the perimeter | Designed to last as long as the slab itself if undisturbed; no top-ups | Slab-on-ground construction and non-chemical preferences |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | Termiticide forming a treated zone in the soil beneath and around the building | How long it lasts depends on the label and the soil, and it can be re-applied | Builds working to a budget, and some complex sites |
| Reticulation system | Pipes laid in before the paving goes down, so termiticide can be pumped back into the soil | Recharging is possible for the building's life without disturbing paths | Properties ringed by paving or landscaping |
| Baiting (post-construction) | In-ground stations used to monitor and eliminate the colony | Stations have to be serviced regularly | Existing homes. See termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
We work from your drawings and slab details, specify a system, and fix the price stage by stage before anything is booked.
Penetration collars to all services first, then the under-slab membrane or chemical treatment once the site is ready.
As the walls go up the perimeter and cavity barriers are installed, closing the slab edge as the work progresses.
Where specified, we complete the chemical perimeter or reticulation around the finished building, before paving and landscaping.
The meter box carries a durable notice recording the system, and the builder and certifier each receive the installation certificate.
The owner receives the maintenance guidance and an inspection schedule, which is what keeps the system doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Confirms in writing the system and products installed, the areas protected and the installer's licence | The builder, the certifier, and the owner's records |
| Product information | What physical system or termiticide was used, together with safety data sheets for any chemical | Builder and owner |
| Maintenance & inspection advice | Maintenance guidance and the AS 3660.2 recommended inspection frequency | Homeowner |
Send the architectural or slab plan, the slab type - raft, waffle pod or suspended - the site address, an approximate pour date, and engineering details for any retaining walls or step-downs.
We schedule to the plumber's set-out and the concreter's pour, confirming collar installation before the pour inspection once services are in.
We give developers and volume builders consistent pricing, one contact, and documentation lot by lot.
Missing durable notices or unclear installation records are a common reason for occupation certificate delays. We supply everything together so the certifier has what they need.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area and perimeter | A bigger footprint means more membrane, more perimeter work and more hours |
| System chosen | Full under-slab physical, perimeter-only, chemical and reticulation options are each priced differently |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Site complexity | Retaining walls, step-downs, sandstone excavation and suspended floors add detailing |
| Number of site visits | Staged installations follow the build program. Multi-dwelling sites may be combined. |
Send your plans for a fixed, written quote. There's no charge to quote.
If a system is going to fail it fails at a detail, not across the whole footprint. That is why we photograph each penetration and each stage as it is completed.
A documented, serviced termite management system is something a Lane Cove buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Lane Cove site, not on a default.
Licence 5122967 in NSW, and installations completed to AS 3660.1.
We fit the builder's program, so no barrier stage ever delays a pour.
Durable notice, installation certificate and product information, all handed over.
Single homes, granny flats, duplexes and multi-unit developments alike.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Lane Cove 2066, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
At roughly 7.2 km north-west of the city, Lane Cove is on a route we run regularly. Same-day attendance is usually available. You will be given a time, not a window.
Much of the housing near the harbour is old, with suspended floors and sub-floors that hold damp. Add mature gardens running to the boundary and termites have both shelter and moisture.
Large older homes and converted apartments, with damp lower levels the recurring theme.
We do all of those. A good share of the Lane Cove jobs we run are tenanted or strata properties, so the written record comes as standard.
It is, provided the instructions are followed. We will tell you what to keep clear of and for how long before we leave. Let us know about children, pets or fish tanks when you book.
Normally you can stay. Some treatments mean keeping out of a particular room briefly, and we will flag that when we arrive so you can plan around it.
Usually between one and two hours on site. Bigger properties and heavier infestations take more, and that is included in the quote rather than added afterwards.
You get the AS 3660.1 certificate and the durable notice for the meter box. Call us if activity picks up again and we will arrange the return visit.
All of them. Lane Cove sits alongside Lane Cove North, Riverview, Lane Cove West and Artarmon in our coverage, and they are serviced on the same schedule.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.