What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Cromer 2099 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Cromer.
Postcode 2099 covers Cromer and the streets immediately around it. At about 15.7 km north-east of the CBD it falls in the Northern Beaches, where we have vans out daily. We run Cromer on a regular route, and same-day attendance is usually available.
Our Cromer work takes in the streets by Pukara Place Reserve and Dee Why Beach, through to Dee Why Grand Shopping Centre at the other end.
This is the Northern Beaches area, and our runs here also take in Wheeler Heights, Dee Why and Collaroy Plateau. Salt air and sandy ground keep sub-floors damp here, and damp is what sustains a population.
Around Cromer the pattern is fairly consistent: apartments where the problem is really in the building rather than the flat. Tell us which it is on the phone and we will come prepared for it.
We also work the streets near Long Reef Golf Course and across toward James Morgan Reserve - the whole of 2099 is covered.
Your appointment is confirmed the day before with a real arrival time. Because Wheeler Heights and Dee Why are covered on the same round, 2099 often has an earlier slot available.
A compliant barrier does not mean termites can never reach the building. It means they cannot reach it concealed - they have to build workings where an inspection will find them. That is why the annual inspection is part of the system, not an upsell.
The system does not stop termites existing - it forces them into the open where an inspection will find them. That is why the annual check is part of the system rather than an optional extra.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical layer across the prepared ground, installed before the pour and covering the whole slab footprint.

Collars are sealed to every plumbing and electrical penetration through the slab, the most frequent concealed entry route there is.

The slab edge and the wall cavity take a physical barrier, which denies termites a concealed route up the outside of the slab.

An APVMA-registered termiticide into the soil, optionally with a reticulation pipe network so it can be recharged later without excavation.

On a sloping or elevated site, the bearers, piers and suspended timber floor are all protected.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
If a new Class 1 home or Class 10 outbuilding has termite-susceptible primary building elements, a compliant system is required.
Pipe penetrations and slab joints can only be fully protected before concrete covers them.
No post-construction treatment reaches under the slab. An under-slab system does.
Your certifier must have the installation certificate and durable notice before the Occupation Certificate can issue.
Buyers, inspectors and lenders all respond to documented, compliant termite protection.
A licensed Sydney technician will talk it through and give you a fixed quote within half an hour.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Termite-resistant sheet, stainless mesh or graded stone laid under the slab or at the perimeter, impassable to termites | Lasts as long as the slab when undisturbed, with no chemical recharging | Slab-on-ground homes, and owners choosing a non-chemical option |
| Penetration collars | A physical collar sealed around each pipe and conduit passing through the slab | Long service life where the install before the pour was done properly | Every slab, and usually alongside a perimeter system |
| Chemical soil barrier | A treated soil zone formed with termiticide under and around the structure | Label and soil conditions govern how long it lasts; re-application is possible | Cost-conscious builds and certain complex sites |
| Reticulation system | A network of pipes installed before paving so termiticide can be re-injected into the soil | Rechargeable throughout the building's life, with no need to dig up paths | Homes with paving or landscaping all around them |
| Baiting (post-construction) | Ground stations for monitoring, then baiting to eliminate the colony | The stations must be serviced regularly | Existing homes - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
With your plans and slab details we recommend a system and price every stage, fixed.
Collars go onto every service penetration, and once the site is prepared the under-slab membrane or the chemical treatment is installed.
As the walls go up the perimeter and cavity barriers are installed, closing the slab edge as the work progresses.
A specified chemical perimeter or reticulation system is finished around the building prior to paving and landscaping.
A durable notice goes into the meter box recording the system; builder and certifier each get the installation certificate.
The owner is given maintenance guidance and an inspection schedule that keeps the system effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent plate in the meter box recording the system, the installation date, the life expectancy of any chemical, the installer and the inspection advice | The certifier, the owner, and whoever owns it next |
| Installation certificate | A written statement of system, products, protected areas and installer licence | Builder, certifier and the owner's records |
| Product information | Specifications for the physical system or termiticide used, plus safety data sheets where chemicals are involved | Builder and owner |
| Maintenance & inspection advice | How to keep the barrier effective, and the recommended inspection frequency (AS 3660.2) | Homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We schedule around the plumber's set-out and the concreter's pour. Tell us when services are in and we will confirm the collar installation before the pour inspection.
We give developers and volume builders consistent pricing, one contact, and documentation lot by lot.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| The system specified | Under-slab physical systems, perimeter-only systems and chemical or reticulation options carry different prices |
| How many services | Each service penetrating the slab, plumbing or electrical, needs a collar |
| Site conditions | Detailing increases with retaining walls, step-downs, sandstone excavation and suspended floors |
| Number of visits | The staged install follows your build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
It is one of the few construction details that still matters commercially fifteen years later.
Anywhere in Cromer is within the area we attend for pre-construction work, including sites the larger operators will not travel to.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Cromer site, not on a default.
NSW Pest Management licence 5122967, installing to the AS 3660.1 standard.
We attend to suit the builder's program, so the pour is never held up by a barrier stage.
Durable notice, installation certificate and product details, all supplied.
One house, a granny flat, a duplex, or a full multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Cromer and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Cromer sits roughly 15.7 km north-east of the CBD, inside our Northern Beaches run, so we book a time and keep to it.
Coastal suburbs hold moisture. Sandy soil drains but the air does not dry out, so the conditions under a Cromer house suit termites nearly all year.
Coastal housing here is a mix, but the damp lower level is consistent across most of it.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Cromer 2099 are all covered, with documentation suitable for an agent or a strata manager.
It is, as long as you follow what we tell you on the day - usually keeping off treated surfaces for a couple of hours. Let us know at booking about young children, pets or an aquarium.
Usually not. Most pre-construction termite barriers work is done with you there, and anything that needs the room vacated is for a short period we will tell you about beforehand.
Allow an hour to two hours for most properties. A bigger building, or one where the problem has spread, takes longer - and we would rather tell you that when quoting than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
We do. Cromer and Wheeler Heights, Dee Why, Collaroy Plateau and Narraweena are all on the same route, which helps if you own more than one property in the area.
Photographs from Elite jobs across Sydney — not stock imagery.
Fast and fully insured, with a no-obligation quote back to you within 30 minutes.