What we need to quote
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
Pre-Construction Termite Barriers in Dawes Point 2000 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Dawes Point.
Our Sydney CBD & Inner City technicians cover Dawes Point and the rest of 2000 as a matter of course - it is only about 1.4 km north of the city. Our technicians are through Dawes Point most days, so same-day attendance is usually available.
The Dawes Point addresses we attend cluster around Milson Village and Barangaroo station. Circular Quay station is another part of the suburb we are called to often.
The Rocks, Millers Point and Barangaroo are all on the same route as Dawes Point. In a tower the population is usually shared. We treat your unit and tell you plainly if the source is common property, because that is what the building has to act on.
What we see in Dawes Point is apartments where the problem turns out to be in the riser or the bin room rather than the flat. Describing it accurately when you book saves a second visit.
Our Dawes Point runs also take in Observatory Hill Park and the area near First Fleet Park, so the whole postcode is served.
The 2000 run is set the day before and you are given an arrival time. Where The Rocks and Millers Point fall on the same round, we can usually bring the visit forward.
People expect a barrier to be a wall. It is a managed zone: termites either cannot cross it or must build visible workings to do so.
The exposed slab edge is a designed part of the system: it is where an inspector can see workings before they reach the frame. Most of the failed inspection zones we find on Dawes Point homes were buried by a landscaper who was never told.
A barrier is only as good as its weakest penetration. One untreated conduit gives a colony a clean route into the frame.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A physical, termite-resistant membrane laid over the prepared ground ahead of the pour, covering the slab's entire footprint.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A barrier around the slab edge and into the wall cavity prevents termites tunnelling unseen up the slab's outer face.

Termiticide registered with the APVMA goes into the soil, and a reticulation pipe network can be added so later recharging needs no digging.

Sloping and elevated blocks get their piers, bearers and suspended timber floors protected.

Detailed work against retaining walls, sandstone cuts, step-downs and the cut-and-fill sites common around Sydney.
Once the slab is poured, the areas termites use most are sealed away for good.
It costs far less now than retrofitting later, and vastly less than repairing termite damage.
A compliant termite management system is required for new Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements.
Pipe penetrations and slab joints are only fully protectable while they are still exposed, before the concrete goes over.
Areas no post-construction treatment can ever reach are covered by an under-slab system.
The Occupation Certificate will not be issued until the certifier has the installation certificate and durable notice.
Documented, compliant termite protection reassures buyers, building inspectors and lenders.
Get a licensed Sydney technician on the phone today - honest advice, fixed quote in 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Physical collars sealed around all pipes and conduits penetrating the slab | Correctly installed before the pour, they last | All slabs, normally combined with a perimeter system |
| Chemical soil barrier | A treated zone of termiticide in the soil under and around the building | Service life depends on the product label and soil conditions. It can be re-applied. | Budget-conscious builds and some complex sites |
| Reticulation system | Pipework laid before paving, allowing termiticide to be pumped into the soil later | Can be recharged for the life of the building without lifting paths | Houses surrounded by paving or heavy landscaping |
| Baiting (post-construction) | In-ground monitoring stations that take out the colony | Regular station servicing is required | Existing homes, covered under termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Send through the plans and slab details, and we will recommend a system with a fixed price for each stage.
Every service through the slab is collared first, then the under-slab membrane or chemical treatment goes down on the prepared site.
As the brickwork or cladding rises, perimeter and cavity barriers go in so the slab edge is left with no gap.
A chemical perimeter or reticulation system, where specified, is completed around the building before any paving or landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
At handover the owner gets maintenance advice and a recommended inspection schedule so the system stays effective.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | Written confirmation of the system and products installed, the areas protected and the installer's licence | The builder, the certifier and the owner's records |
| Product information | Information on the physical system or termiticide applied, including chemical safety data sheets | The builder and the owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
The architectural or slab plan, which slab type it is - raft, waffle pod, suspended - the site address, approximate pour date, and any retaining wall or step-down engineering.
We schedule to the plumber's set-out and the concreter's pour, confirming collar installation before the pour inspection once services are in.
Developers and volume builders get consistent pricing, a single point of contact and documentation for every lot or dwelling.
Occupation certificates are often held up by a missing durable notice or vague installation records. Everything is supplied together so the certifier is not left chasing.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | Larger footprints need more membrane, more perimeter protection and more labour |
| The system specified | Under-slab physical systems, perimeter-only systems and chemical or reticulation options carry different prices |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
Estates built on cleared farmland inherit the colonies already living in that soil. A new Dawes Point house is not a fresh start from a termite point of view - it is a new food source on an established site.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Dawes Point site, not on a default.
NSW licence 5122967, and installation work done to AS 3660.1.
Our scheduling follows the builder's program - a barrier stage will not hold up your pour.
Durable notice, installation certificate and product details, all supplied.
From a single dwelling or granny flat through to duplexes and multi-unit projects.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. We quote on the property rather than the postcode, so a unit in Dawes Point and a large house are priced differently. The figure is fixed before any work starts. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. We are about 1.4 km north of the city here, and Dawes Point is covered by the Sydney CBD & Inner City team.
Density is the whole answer. Shared walls, shared risers and shared bins mean termites move between lots freely, which is why single-unit treatments here often do not hold.
Apartments throughout, which means treating your lot and scoping the building where the pattern points at common property.
Yes. Houses, townhouses, units, strata common property, rentals and commercial sites in Dawes Point 2000 are all part of what we do, and the paperwork is the kind agents accept.
It is, applied properly. We put product into cracks, voids and stations rather than across open surfaces, and we will tell you what to stay off and for how long before we leave.
In the great majority of jobs, no. If one area needs to be left for an hour or two we say so before we start rather than after.
Allow one to two hours for a typical Dawes Point property. Larger homes, or ones where the problem has spread, take longer and we will say so when we quote.
You get the AS 3660.1 certificate and the durable notice for the meter box. That is the point of the warranty - you do not pay twice for the same problem.
Yes. As well as Dawes Point we cover The Rocks, Millers Point, Barangaroo and Milsons Point on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.