What we need to quote
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Pre-Construction Termite Barriers in Hurlstone Park 2193 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Hurlstone Park.
We treat termites right across 2193. Hurlstone Park is roughly 8.7 km south-west of the city, which puts it well inside the Inner West run our technicians work. Our technicians are through Hurlstone Park most days, so same-day attendance is usually available.
Most weeks we are somewhere between Jack Shanahan Park and Ashfield Mall in Hurlstone Park, and Campsie Shopping Centre is close enough to be on the same run.
We work under the Inner West, Burwood, Strathfield and Canada Bay area here, and Dulwich Hill, Canterbury and Earlwood are all on the same route, which matters when termite problems are moving between adjoining properties. Terraces, semis and converted blocks share cavities and risers, which is why a single-unit treatment often does not hold on its own.
Hurlstone Park jobs tend to be apartments and converted blocks where the kitchen backs onto a service riser. Let us know which when you ring and we will plan the visit around it.
Our Hurlstone Park runs also take in Hurlstone Park station and the area near Canterbury station, so the whole postcode is served.
When you book, we confirm the 2193 run the day before and give you an arrival time rather than a window. If we are already out at Dulwich Hill or Canterbury that morning, we will usually offer you the earlier slot.
AS 3660.1 is the standard for termite management in new construction, and it is what the certifier signs against. A Hurlstone Park build without a compliant, certified system does not get its occupation certificate.
Everything about a barrier is easier before the pour. That is the whole argument for getting it right the first time.
The failures we are called to inspect are rarely the product. They are a collar missed on a late-added pipe, a perimeter left short at a step-down, or a membrane torn by a trade after we left and never reported.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A termite-resistant physical membrane laid across the prepared ground before the pour, protecting the whole footprint of the slab.

A collar is sealed around each plumbing pipe, conduit and service passing through the slab, because those are the most common hidden entry points.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

The soil is treated with an APVMA-registered termiticide, and a reticulation network can be laid so recharging never means digging.

Bearers, piers and suspended timber floors protected on sloping and elevated sites.

Retaining walls, sandstone excavation, step-downs and cut-and-fill - all common in Sydney, all needing their own detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
A barrier installed during the build costs far less than one retrofitted afterwards or any damage repair.
Under the NCC, Class 1 homes and Class 10 outbuildings with termite-susceptible primary building elements require a compliant termite management system.
Pipe penetrations and slab joints can be fully sealed only while the concrete has yet to cover them.
No post-construction treatment reaches under the slab. An under-slab system does.
The certifier needs the installation certificate and the durable notice in hand to issue the Occupation Certificate.
Compliant, documented termite protection is something buyers, building inspectors and lenders all look for.
One call to a licensed Sydney technician gets you straight advice and a fixed quote within 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Membrane, stainless mesh or graded stone forming a layer termites cannot pass, beneath the slab or around the perimeter | Designed to last as long as the slab itself if undisturbed; no top-ups | Slab-on-ground construction and non-chemical preferences |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Treated soil - termiticide applied beneath and around the building | Longevity depends on label and soil conditions, and it can be renewed | Cost-conscious builds, and some complex sites |
| Reticulation system | Pipework laid before the paving so termiticide can be pumped back into the soil later | Rechargeable for the life of the building, with no need to lift paths | Houses ringed by paving or landscaping |
| Baiting (post-construction) | In-ground monitoring stations that eliminate the colony | Stations need regular servicing | Existing homes, see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
We work from your drawings and slab details, specify a system, and fix the price stage by stage before anything is booked.
Service penetrations collared, and the under-slab membrane or chemical treatment installed once site preparation is done.
While the brickwork or cladding goes up, the perimeter and cavity barriers are installed, leaving no gap at the slab edge.
Where the design calls for it, the chemical perimeter or reticulation is completed around the finished building ahead of paving and landscaping.
A durable notice in the meter box documents the system; the installation certificate is issued to the builder and certifier.
The owner receives the maintenance guidance and an inspection schedule, which is what keeps the system doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | The permanent meter-box notice recording the system, the install date, any chemical's life expectancy, the installer and inspection advice | The certifier, the owner, and owners after them |
| Installation certificate | A written record of the system and products installed, which areas are protected, and the installer's licence number | The builder, the certifier and the owner's file |
| Product information | Specifications for the physical system or termiticide used, plus safety data sheets where chemicals are involved | Builder and owner |
| Maintenance & inspection advice | Keeping the barrier effective, and how often to inspect under AS 3660.2 | The homeowner |
Plans or slab plan, slab type (raft, waffle pod, suspended), site address, approximate pour date, and engineering details for retaining walls and step-downs.
Scheduling works around the plumber's set-out and the concreter's pour. Let us know when services are in and we confirm collar installation ahead of the pour inspection.
Consistent pricing, one point of contact and per-lot documentation for developers and volume builders.
The common cause of occupation certificate delay is a missing durable notice or unclear records - so we supply everything together.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | The bigger the footprint, the more membrane, perimeter protection and labour required |
| System type | Full under-slab physical systems, perimeter-only systems and chemical or reticulation options are priced differently |
| Service penetrations | Every plumbing and electrical penetration through the slab has to be collared |
| Difficulty of the site | Retaining walls, step-downs, sandstone excavation and suspended floors add to the detailing |
| Site visits required | Staging follows the build program; multi-dwelling sites may be combined into fewer visits |
Send your plans for a fixed, written quote. There's no charge to quote.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Hurlstone Park site, not on a default.
A documented, serviced termite management system is something a Hurlstone Park buyer's pest inspector will note favourably. The absence of paperwork is something they will note the other way.
The assumption that a new build is low risk is backwards. New construction on previously vegetated land is exactly where we see early activity.
Licensed in NSW under 5122967, with all installations carried out to AS 3660.1.
We attend to suit the builder's program, so the pour is never held up by a barrier stage.
Durable notice, certificate of installation and product details - all supplied together.
One house, a granny flat, a duplex, or a full multi-unit project.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Hurlstone Park 2193, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Hurlstone Park sits roughly 8.7 km south-west of the CBD, inside our Inner West run, so we book a time and keep to it.
Two things stack up here: shared structure and old drainage. Either one on its own is manageable; together they are why termites in this kind of housing is a street-level problem.
Joined older housing, often with a paved rear courtyard holding damp against the wall. Both things shape the treatment.
We do. A lot of our Hurlstone Park work is rentals and strata, so the report, the products used and the areas treated are all recorded in writing for whoever needs them.
Yes, applied correctly. Products are registered for this use, placed out of reach rather than across open surfaces, and you will know what to stay off and for how long.
Normally you can stay. Some treatments mean keeping out of a particular room briefly, and we will flag that when we arrive so you can plan around it.
Allow an hour to two hours for most properties. A bigger building, or one where the problem has spread, takes longer - and we would rather tell you that when quoting than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
Yes - we work right across the Inner West, Burwood, Strathfield and Canada Bay area, which takes in Hurlstone Park and the suburbs around it.
Photographs from Elite jobs across Sydney — not stock imagery.
Insured, licensed technicians and a straight quote within 30 minutes - no obligation either way.