What we need to quote
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
Pre-Construction Termite Barriers in Sydney 2000 — local technicians, fixed prices and a written report. Barriers are quoted off your plans and slab details.
Real, verified feedback from people we've helped — straight from Google.
Local technicians, fixed prices and a written report for every job in Sydney.
Postcode 2000 covers Sydney and the streets immediately around it. At about 0.3 km south-west of the CBD it falls in the Sydney CBD & Inner City, where we have vans out daily. Our technicians are through Sydney most days, so same-day attendance is usually available.
A lot of our Sydney jobs are in the streets around Tumbalong Park and Westfield Sydney, and we are out near Central Park Mall regularly enough that the technician usually knows the access before they arrive.
We cover Barangaroo, Millers Point and Haymarket on the same runs as Sydney, which helps when termite problems are moving between neighbouring properties. Nearly everything here is apartments, so the question is always whether the problem is in your flat or in the building - the risers, the bin room, the wall cavities between lots.
Most Sydney bookings come in as units in towers where the kitchen backs onto shared services. Say which one applies when you call 1300 313 373 and the technician will have the right products on the van.
We cover the remainder of 2000 as well, from Town Hall station through to Gadigal station.
The 2000 run is set the day before and you are given an arrival time. Where Barangaroo and Millers Point fall on the same round, we can usually bring the visit forward.
A barrier does not stop being compliant when a garden bed goes in over it, but it does stop being inspectable - which amounts to the same thing a few years later.
Retro-fitting means drilling and injecting a finished slab, working around landscaping and services. It is slower, more expensive and less complete than doing it at construction on a Sydney block.
The value is detectability. A Sydney house with a barrier and no inspections has half a system.
Photos from our own Sydney installations, not stock images. We recommend the right mix for your slab design, site and budget.

A sheet membrane that termites cannot pass, laid across the prepared ground before the pour so the entire footprint is covered.

Every penetration through the slab is collared and sealed. These are the hidden entry points termites use most.

A physical barrier around the slab edge and into the wall cavity, which stops termites building concealed tunnels up the outside of the slab.

APVMA-registered termiticide applied to the soil. Add a reticulation network and the barrier can be topped up later without digging anything up.

Protection for the piers, bearers and suspended timber flooring on elevated or sloping sites.

Sydney sites bring retaining walls, sandstone excavation, step-downs and cut-and-fill, each of which needs specific detailing.
Once the slab is poured, the areas termites use most are sealed away for good.
Installing at construction costs a fraction of retrofitting a system, let alone repairing termite damage later.
If a new Class 1 home or Class 10 outbuilding has termite-susceptible primary building elements, a compliant system is required.
Once concrete covers them, pipe penetrations and slab joints cannot be fully protected - it has to happen before the pour.
Areas no post-construction treatment can ever reach are covered by an under-slab system.
No Occupation Certificate is issued without the installation certificate and durable notice going to the certifier.
Buyers, building inspectors and lenders all take comfort from documented, compliant termite protection.
Speak to a licensed Sydney technician now. Straight advice, and a fixed quote inside 30 minutes.
Both approaches can comply with AS 3660.1. Many Sydney builds use a combination.
| System | How it works | Durability & upkeep | Best suited to |
|---|---|---|---|
| Physical membrane, mesh or graded stone | Sheet membrane, stainless mesh or graded stone particles form a layer termites cannot pass, under the slab or at the perimeter | Lasts as long as the slab unless disturbed, and never needs a chemical top-up | Slab-on-ground homes, and anyone wanting a non-chemical system |
| Penetration collars | Collars physically sealed to every pipe and conduit through the slab | Long-lived where installation before the pour is done properly | Every slab, and typically with a perimeter system as well |
| Chemical soil barrier | Treated soil - termiticide applied beneath and around the building | Longevity depends on label and soil conditions, and it can be renewed | Cost-conscious builds, and some complex sites |
| Reticulation system | Pipework installed before paving so the soil can be re-treated by pumping | Can be topped up for the life of the building with no excavation of paths | Houses surrounded by paving or landscaped areas |
| Baiting (post-construction) | Stations in the ground that monitor activity and eliminate the colony | They need servicing on a regular basis | Existing buildings - see termite control |
Termite barriers are installed in stages that follow the build, not in a single visit.
Plans and slab details to us, and you get a system recommendation plus a fixed price stage by stage.
Every service gets its collar, then the under-slab membrane or chemical treatment is installed on the prepared site.
While the brickwork or cladding goes up, the perimeter and cavity barriers are installed, leaving no gap at the slab edge.
The chemical perimeter or reticulation system, if specified, goes in around the completed building before paving and landscaping.
A durable notice in the meter box records the system. The installation certificate goes to the builder and certifier.
Maintenance advice and an inspection schedule go to the owner, so the system keeps doing its job.
| Document | What it is | Who needs it |
|---|---|---|
| Durable notice | A permanent notice fixed inside the meter box recording system, installation date, chemical life expectancy, installer and inspection advice | Certifier, owner and future owners |
| Installation certificate | Written confirmation of the installed system and products, the areas protected, and the licence of the installer | The builder, the certifier and the owner's records |
| Product information | Specifications for the physical system or termiticide used, plus safety data sheets where chemicals are involved | Builder and owner |
| Maintenance & inspection advice | What keeps the barrier working, and the inspection frequency recommended by AS 3660.2 | The homeowner |
Architectural plans or a slab plan, slab type (raft, waffle pod, suspended), the site address, approximate pour date and any engineering details for retaining walls or step-downs.
Our scheduling follows the plumber's set-out and the concreter's pour date. Once services are in, tell us and we confirm collars before the pour inspection.
For developers and volume builders: consistent pricing, one point of contact, and documentation issued for every lot or dwelling.
Delays at occupation certificate stage usually come down to a missing durable notice or unclear records. We provide the complete set at once.
A barrier only works if it stays intact and visible. Homeowners should follow these points for the life of the building.
| Factor | Why it matters |
|---|---|
| Slab area & perimeter length | A larger footprint requires more membrane, more perimeter work and more labour |
| System type | There is a real price difference between under-slab physical, perimeter-only, chemical and reticulation systems |
| Number of penetrations | Every plumbing and electrical penetration through the slab needs a collar |
| Complexity of the site | Retaining walls, step-downs, sandstone cuts and suspended floors each add detailing |
| Number of site visits | Staging follows the build program, and multi-dwelling sites can be combined |
Send your plans for a fixed, written quote. There's no charge to quote.
Our barrier work takes in Sydney and across toward Barangaroo, on single builds and multi-lot developments alike.
Reactive soil is the argument for a system that tolerates movement rather than a rigid one. We choose based on the soil report for the Sydney site, not on a default.
A barrier is a continuous system, so it fails at the join. On Sydney sites the usual culprits are a penetration added after our visit and a section of slab edge covered before anyone inspected it.
NSW licence 5122967, and installation work done to AS 3660.1.
We work to your builder's program, so a barrier stage never holds up a pour.
The durable notice, installation certificate and product details are all provided.
Single dwellings, granny flats, duplexes and multi-unit developments.
Everything you need to know before you book. Still unsure? Call us — we're happy to help.
Get a Free QuoteBarriers are quoted off your plans and slab details. What changes the figure is the size of the building, how many areas are affected and the access. You get that number up front for Sydney 2000, with no call-out fee. You get the AS 3660.1 certificate and the durable notice for the meter box.
Same-day attendance is usually available. Sydney is about 0.3 km south-west of the CBD in the Sydney CBD & Inner City, and we give you a firm arrival time rather than an all-day window.
The building is the unit of the problem, not the apartment. Shared risers, bin rooms and wall cavities connect every lot, so termites established anywhere in the block can reach any flat in it.
Unit stock, so the method is gels and baits placed into cavities rather than anything sprayed across shared surfaces.
Yes - freestanding homes, townhouses, apartments, rentals and business premises in Sydney 2000 are all covered, with documentation suitable for an agent or a strata manager.
Yes. The products are registered for this use and applied at label rates, and placement keeps them away from where children and animals go. Let us know at booking about pets, fish tanks or anyone with asthma and we will plan the visit around it.
In most cases you can stay. Where an area does need to be left clear it is for a couple of hours at most, and we say so before we start.
Allow an hour to two hours for most properties. A bigger building, or one where the problem has spread, takes longer - and we would rather tell you that when quoting than rush it.
You get the AS 3660.1 certificate and the durable notice for the meter box. Ring us if activity picks up again inside that period and we will arrange the return.
Yes. As well as Sydney we cover Barangaroo, Millers Point, Haymarket and Pyrmont on the same runs, so a job that crosses a boundary can be handled in one visit.
Photographs from Elite jobs across Sydney — not stock imagery.
Friendly, fully insured technicians and a no-obligation quote inside 30 minutes.